HomeMy WebLinkAbout0111928-Building (machine shop office)
No111928
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
BBB REAL ESTATE LLC
Job Address2916 ALGOMA BLVDOwnerCreate Date11/17/2004
DesignerContractorFOX CITIES CONST CORP
Category211 - Alteration IndustrialPlan
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0StoriesCanopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitFlood PlainHeight Permit
Park Dedication# Dwelling Units0# Structures0
Machine Shop/ Install a bigger window for an office along the North wall of the building. Install a new door with side light into this same office.
Use/Nature
Install suspended ceiling in this office.
of Work
HVAC ContractorPlumbing Contractor
Electric Contractor
Fees: Valuation$9,000.00Plan Approval$0.00Permit Fee Paid$68.00Park Dedication$0.00
12/07/200400/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #1225003000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
4614 RED FOX RDOSHKOSHWI549040000235-8008
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.