HomeMy WebLinkAbout0111896-Building (sunroom)No111896
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
MR/MRS JAMES G OSBORNE
Job Address1530 MARICOPA DROwnerCreate Date11/17/2004
DesignerContractorREMODELING AND DESIGN GROUP INC
Category141 - Exterior RemodelingPlan
TypeBuildingSignCanopyFenceRaze
ZoningClass of Const:Size
Sq. Ft.Projection
Unfinished/Basement0Rooms0Height0Ft.
Finished/Living
0Sq. Ft.Bedrooms0StoriesCanopies0
Garage0Sq. Ft.Baths0Signs0
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitNot RequiredFlood PlainHeight Permit
Park Dedication# Dwelling Units0# Structures0
SFR/ Installing a glass sunroom on an existing foundation with 48" of frost protection. The existing patio door will remain between the glass
Use/Nature
room and house.
of Work
HVAC ContractorPlumbing Contractor
Electric ContractorUNKNOWN????
Fees: Valuation$15,014.00Plan Approval$0.00Permit Fee Paid$104.00Park Dedication$0.00
12/03/200400/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #1319850000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
SignatureDate
Agent/Owner
1530 MARICOPA DROSHKOSHWI549048230
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.