Loading...
HomeMy WebLinkAbout2004-BuildingOSHKOSH ON THE WATER .lob Address 1347 WASHINGTON AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TERRYJ LAIB Contractor LAIB RESTORATION INC Category 140 - Interior Remodeling No 111915 Create Date 12/06/2004 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Remodeling a kitchen to include removing a load bearing wall and replacing it with a lam beam with the inside point load to be transferred of Work [o a new column and 24" x 24" x 12" post pad in the basement, new cabinets and countertops. HVAC Contractor Plumbing Contractor WELLNITZ PLUMBING Electric Contractor WITZKE ELECTRIC INC Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 12/06/2004 Final/O.P. 00/00/0000 Permit Voided Parcel Id # 0203720000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 21 W NEWYORKAVE OSHKOSH WI 54901 - 3757 Telephone Number 233-7026 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.