Loading...
HomeMy WebLinkAbout23-08 CO #1 (Final)_10-15-24TO: PTS CONTRACTORS CHANGE ORDER #1 (FINAL) 4075 EATON ROAD GREEN BAY, WI 54311 Your present contract with the City of Oshkosh, Contract No. 23-08, awarded January 24, 2023, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($476,439.80) NET INCREASE TO ADDITIONAL WORK:$5,133.07 NET DECREASE TO CONTRACT ($471,306.73) SECTION I TOTALS BID TOTAL $5,678,000.00 $5,678,000.00 CO #1 ($471,306.73)($471,306.73) CONTRACT TOTAL $5,206,693.27 $5,206,693.27 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: OCTOBER 15, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL 23-08 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1010 Clearing; complete as specified Stations 2.00 2.00 $3,080.00 1011 Clearing; complete as specified Inch Diameter 460.00 460.00 $15.00 1020 Grubbing; complete as specified Stations 2.00 2.00 $3,080.00 1021 Grubbing; complete as specified Inch Diameter 460.00 460.00 $10.00 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $346,562.45 1100 Removing pavement; complete as specified Square Yards 5,400.00 5,035.80 -364.20 $3.40 ($1,238.28) 1110 Removing curb and gutter; complete as specified Linear Feet 2,050.00 1,989.16 -60.84 $2.30 ($139.93) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 45,000.00 48,243.40 3243.40 $0.60 $1,946.04 1200 Unclassified excavation; complete as specified Cubic Yards 5,500.00 5,267.91 -232.09 $18.40 ($4,270.46) 1220 Excavation special (paving); complete as specified Tons 925.00 0.00 -925.00 $0.01 ($9.25) 1225 Sediment storage area; complete as specified Lump Sum 1.00 1.00 $1.00 1226 Dredge material; load; transport; and dispose of dewatered sediment; complete as specified Cubic Yards 250.00 0.00 -250.00 $1.00 ($250.00) 1301 7" concrete pavment; with 5" CABC and grading; complete as specified Square Yards 10,500.00 10,736.70 236.70 $46.85 $11,089.40 1303 7" concrete pavement HES; with 5" CABC and grading; complete as specified Square Yards 1,200.00 973.50 -226.50 $51.00 ($11,551.50) 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 850.00 690.00 -160.00 $69.20 ($11,072.00) 1334 Concrete pavement gaps; complete as specified Each 2.00 0.00 -2.00 $1,025.00 ($2,050.00) 1340 Crushed aggregate base course; complete as specified Tons 2,150.00 0.00 -2,150.00 $7.20 ($15,480.00) 1350 Pavement ties; complete as specified Each 85.00 50.00 -35.00 $10.25 ($358.75) 1352 Drilled dowel bars; 1"; complete as specified Each 30.00 22.00 -8.00 $13.30 ($106.40) Page 2 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 310.00 94.00 -216.00 $16.40 ($3,542.40) 1360 Adjust manholes and inlets; complete as specified Each 100.00 87.00 -13.00 $330.00 ($4,290.00) 1370 Turf restoration; complete as specified Square Yards 13,750.00 11,172.40 -2,577.60 $8.20 ($21,136.32) 1372 Restore gravel driveway/ apron; complete as specified Square Yards 150.00 138.10 -11.90 $23.60 ($280.84) 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 1,875.00 0.00 -1,875.00 $0.01 ($18.75) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 1,875.00 0.00 -1,875.00 $0.01 ($18.75) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 375.00 0.00 -375.00 $10.25 ($3,843.75) 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 700.00 822.70 122.70 $14.30 $1,754.62 1440 30" curb and gutter; 7": with 5" CABC and grading; complete as specified Linear Feet 150.00 338.30 188.30 $41.10 $7,739.13 1460 Sidewalk curb; complete as specified Linear Feet 400.00 459.20 59.20 $35.95 $2,128.24 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 31,500.00 21,296.20 -10,203.80 $7.45 ($76,018.31) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 20,000.00 21,803.50 1803.50 $8.05 $14,518.19 1514 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 6,200.00 5,083.00 -1,117.00 $8.45 ($9,438.65) 1530 6" concrete step; complete as specified Square Feet 425.00 618.70 193.70 $61.65 $11,941.61 1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 530.00 310.00 -220.00 $32.80 ($7,216.00) 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 6,000.00 4,890.00 -1,110.00 $1.80 ($1,998.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 515.00 445.00 -70.00 $5.65 ($395.50) Page 3 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 8,500.00 811.30 -7,688.70 $0.70 ($5,382.09) 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 8,500.00 0.00 -8,500.00 $1.00 ($8,500.00) 1590 Up-charge for late cold weather concrete sidewalk; complete as specified Cubic Yards 130.00 40.90 -89.10 $20.50 ($1,826.55) 1600 Furnish and install tree; complete as specified Each 22.00 12.00 -10.00 $565.00 ($5,650.00) 1650 Locate existing property monuments; complete as specified Each 50.00 59.00 9.00 $38.00 $342.00 1651 Replace section corner; complete as specified Each 1.00 1.00 $515.00 1652 Replace existing property monuments; complete as specified Each 50.00 41.00 -9.00 $50.00 ($450.00) 1700 Sawing existing pavement; complete as specified Linear Feet 2,300.00 2,181.90 -118.10 $3.00 ($354.30) 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 625.00 348.20 -276.80 $3.00 ($830.40) 1800 Base aggregate dense; 3/4"; complete as specified Tons 55.00 65.47 10.47 $40.25 $421.42 1900 Tack coat; complete as specified Gallons 260.00 40.00 -220.00 $8.30 ($1,826.00) 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 925.00 1,314.10 389.10 $50.60 $19,688.46 1911 4" asphaltic transition LT with 10" CABC and grading complete as specified Square Yards 2,500.00 2,346.50 -153.50 $48.50 ($7,444.75) 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 140.00 135.00 -5.00 $66.25 ($331.25) 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 300.00 0.00 -300.00 $40.85 ($12,255.00) 1918 Asphaltic cold weather paving; complete as specified Square Yards 575.00 0.00 -575.00 $47.50 ($27,312.50) 1971 Remove and replace chain link fence; complete as specified Linear Feet 100.00 90.09 -9.91 $56.50 ($559.92) 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 275.00 277.90 2.90 $12.30 $35.67 Page 4 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 1.00 1.00 $280.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 40.00 0.00 -40.00 $5.10 ($204.00) 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 30.00 43.00 13.00 $100.00 $1,300.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 850.00 628.50 -221.50 $61.00 ($13,511.50) 2004 Furnish and install 12" RCP Class III storm sewer; complete as specified Linear Feet 60.00 49.00 -11.00 $77.00 ($847.00) 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 280.00 233.00 -47.00 $69.00 ($3,243.00) 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 900.00 835.00 -65.00 $74.00 ($4,810.00) 2012 Furnish and install 21" storm sewer; complete as specified Linear Feet 100.00 58.00 -42.00 $108.00 ($4,536.00) 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 900.00 837.50 -62.50 $104.00 ($6,500.00) 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 400.00 350.00 -50.00 $132.00 ($6,600.00) 2033 Furnish and install 54" storm sewer; complete as specified Linear Feet 450.00 422.00 -28.00 $272.00 ($7,616.00) 2047 Furnish and install 19" x 30" HERCP Class III storm sewer; complete as specified Linear Feet 420.00 393.00 -27.00 $118.00 ($3,186.00) 2059 Furnish and install 48" x 76" HERCP Class III storm sewer; complete as specified Linear Feet 300.00 278.00 -22.00 $344.00 ($7,568.00) 2061 Furnish and install 53" x 83" HERCP Class III storm sewer; complete as specified Linear Feet 330.00 285.50 -44.50 $392.00 ($17,444.00) 2155 Furnish and install 19" x 30" RCP Class III apron endwall with joint ties; complete as specified Each 1.00 1.00 $19,025.00 2162 Furnish and install 53" x 83" RCP Class III apron endwall with joint ties; complete as specified Each 1.00 1.00 $25,845.00 Page 5 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 110.00 102.82 -7.18 $450.00 ($3,231.00) 2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 30.00 28.95 -1.05 $830.00 ($871.50) 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 10.00 9.37 -0.63 $990.00 ($623.70) 2205 Furnish and install standard storm sewer manhole (8' diameter); complete as specified Vertical Feet 10.00 8.95 -1.05 $1,335.00 ($1,401.75) 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as spcified Vertical Feet 4.00 2.49 -1.51 $728.00 ($1,099.28) 2225A Furnish and install storm sewer junction chamber X- 35; complete as specified Each 1.00 1.00 $14,385.00 2225B Furnish and install storm sewer junction chamber Z- 37; complete as specified Each 1.00 1.00 $17,260.00 2225C Furnish and install storm sewer junction chamber Z- 39; complete as specified Each 1.00 1.00 $14,050.00 2225D Furnish and install storm sewer junction chamber Z- 40; complete as specified Each 1.00 1.00 $13,875.00 2225E Furnish and install storm sewer junction chamber Z- 41; complete as specified Each 1.00 1.00 $13,260.00 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 4.00 3.00 -1.00 $3,175.00 ($3,175.00) 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 40.00 33.00 -7.00 $2,585.00 ($18,095.00) 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 2,150.00 1,971.50 -178.50 $59.00 ($10,531.50) 2404 Furnish and install storm sewer marker balls; complete as specified Each 135.00 125.00 -10.00 $41.00 ($410.00) 2406 Furnish and install storm sewer clay dams; complete as specified Each 66.00 63.00 -3.00 $86.00 ($258.00) 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 65.00 59.00 -6.00 $918.00 ($5,508.00) Page 6 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2414 Storm lateral inlet adjustments; complete as specified Each 65.00 11.00 -54.00 $1.00 ($54.00) 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 85.00 72.00 -13.00 $71.00 ($923.00) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 85.00 0.00 -85.00 $1.05 ($89.25) 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 0.00 -2.00 $1.00 ($2.00) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 85.00 0.00 -85.00 $10.25 ($871.25) 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 300.00 0.00 -300.00 $8.20 ($2,460.00) 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 4.00 0.00 -4.00 $1.00 ($4.00) 2526 Furnish; install; maintain; and remove turbidity barrier; complete as specified Each 3.00 2.00 -1.00 $4,315.00 ($4,315.00) 2632 Furnish and install Class I; Urban; Type A erosion control mat; complete as specified Square Yards 400.00 0.00 -400.00 $2.05 ($820.00) 2650 Furnish and install heavy rip- rap with filter fabric; complete as specified Square Yards 75.00 8.00 -67.00 $85.00 ($5,695.00) 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 110.00 93.00 -17.00 $10.00 ($170.00) 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 800.00 572.00 -228.00 $16.00 ($3,648.00) 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 425.00 491.00 66.00 $28.00 $1,848.00 2810 Abandon storm sewer manholes and inlets; complete as specified Each 12.00 10.00 -2.00 $230.00 ($460.00) 2812 Remove storm sewer manholes and inlets; complete as specified Each 12.00 8.00 -4.00 $230.00 ($920.00) 2850 Connect to existing storm sewer main; complete as specified Each 8.00 6.00 -2.00 $1,850.00 ($3,700.00) Page 7 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2852 Connect to existing storm sewer lateral; complete as specified Each 2.00 0.00 -2.00 $190.00 ($380.00) 2854 Connect lateral to existing storm sewer main; complete as specified Each 2.00 0.00 -2.00 $230.00 ($460.00) 2856 Connect to existing storm sewer manhole; complete as specified Each 2.00 0.00 -2.00 $390.00 ($780.00) 2858 Connect to existing storm sewer inlet; complete as specified Each 2.00 0.00 -2.00 $390.00 ($780.00) 2914 Storm sewer utility line opening (ULO); complete as specified Each 5.00 1.00 -4.00 $1.00 ($4.00) 2950 Excavation special (storm); complete as specified Tons 150.00 56.53 -93.47 $1.00 ($93.47) 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 2,730.00 2,718.00 -12.00 $133.00 ($1,596.00) 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 50.00 53.00 3.00 $158.00 $474.00 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 955.00 956.50 1.50 $169.00 $253.50 3006 Furnish and install 15" sanitary sewer (relay); complete as specified Linear Feet 15.00 8.00 -7.00 $481.00 ($3,367.00) 3008 Furnish and install 18" sanitary sewer (relay); complete as specified Linear Feet 15.00 11.00 -4.00 $501.00 ($2,004.00) 3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 11.00 3.84 -7.16 $310.00 ($2,219.60) 3062 Furnish and install 10" sanitary sewer drop; complete as specified Vertical Feet 5.00 10.46 5.46 $437.00 $2,386.02 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 189.00 188.02 -0.98 $425.00 ($416.50) 3114 Furnish and install external sanitary sewer manhole chimney seal; complete as specified Each 18.00 17.00 -1.00 $488.00 ($488.00) 3116 Furnish and install external sanitary sewer manhole chimney seal extension; complete as specified Each 2.00 0.00 -2.00 $385.00 ($770.00) 3160 Pour and reshape manhole bench; complete as specified Each 1.00 0.00 -1.00 $2,240.00 ($2,240.00) Page 8 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 70.00 63.00 -7.00 $275.00 ($1,925.00) 3212 Furnish and install 10" x 6" sanitary sewer factory wyes or tees; complete as specified Each 1.00 1.00 $326.00 3214 Furnish and install 12" x 6" sanitary sewer factory wyes or tees; complete as specified Each 3.00 3.00 $455.00 3230 Furnish and install 4" sanitary sewer laterals (new); complete as specified Linear Feet 70.00 0.00 -70.00 $107.00 ($7,490.00) 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 2,510.00 2,312.50 -197.50 $107.00 ($21,132.50) 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 160.00 128.35 -31.65 $116.00 ($3,671.40) 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 152.00 144.00 -8.00 $41.00 ($328.00) 3238 Furnish and install clay dams; complete as specified Each 73.00 70.00 -3.00 $86.00 ($258.00) 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 1.00 3.00 2.00 $1,325.00 $2,650.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 3.00 3.00 $1,345.00 3306 Furnish and install connection to existing 15" sanitary sewer mains; complete as specified Each 1.00 1.00 $2,475.00 3308 Furnish and install connection to existing 18" sanitary sewer mains; complete as specified Each 2.00 2.00 $3,165.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 2.00 0.00 -2.00 $1.00 ($2.00) 3332 Core into existing manhole; complete as specified Each 1.00 1.00 $8,705.00 3404 Furnish and install 10" sanitary sewer open cut casing pipes; complete as specified Linear Feet 120.00 110.00 -10.00 $108.00 ($1,080.00) Page 9 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3410 Furnish and install 18" sanitary sewer open cut casing pipes; complete as specified Linear Feet 15.00 15.00 $200.00 3412 Furnish and install 24" sanitary sewer open cut casing pipes; complete as specified Linear Feet 15.00 15.00 $215.00 3600 Rock excavation; complete as specified Cubic Yards 25.00 0.00 -25.00 $1.00 ($25.00) 3700 Closed circuit televising; complete as specified Linear Feet 3,765.00 0.00 -3,765.00 $1.30 ($4,894.50) 3710 Closed circuit televising - using push camera; complete as specified Each 4.00 1.00 -3.00 $155.00 ($465.00) 3800 Abandon sanitary sewer manholes; complete as specified Each 6.00 6.00 $575.00 3802 Abandon 8" sanitary sewer; complete as specified Linear Feet 618.50 566.00 -52.50 $13.00 ($682.50) 3804 Abandon 10" sanitary sewer; complete as specified Linear Feet 915.00 810.00 -105.00 $16.00 ($1,680.00) 3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 28.70 28.00 -0.70 $25.00 ($17.50) 3810 Abandon 18" sanitary sewer; complete as specified Linear Feet 56.20 55.30 -0.90 $30.00 ($27.00) 3852 Remove sanitary sewer manholes; complete as specified Each 1.00 1.00 $575.00 3854 Remove sanitary sewer; complete as specified Linear Feet 181.00 79.00 -102.00 $31.00 ($3,162.00) 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 4.00 4.00 $1.00 3892 Excavation special (sanitary); complete as specified Tons 70.00 0.00 -70.00 $1.00 ($70.00) 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 280.00 264.50 -15.50 $105.00 ($1,627.50) 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 3,250.00 3,197.00 -53.00 $117.00 ($6,201.00) 4008 Furnish and install 12" ductile iron wtaer main (relay) with polywrap; complete as specified Linear Feet 40.00 48.00 8.00 $170.00 $1,360.00 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 2,400.00 2,251.00 -149.00 $88.00 ($13,112.00) Page 10 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4037 Furnish and install 1 1/4" water service (relay); complete as specified Linear Feet 55.00 128.50 73.50 $97.00 $7,129.50 4042 Furnish and install 1" water service (new); complete as specified Linear Feet 95.00 0.00 -95.00 $88.00 ($8,360.00) 4048 Furnish and install 1" corporation and stop box; complete as specified Each 68.00 62.00 -6.00 $540.00 ($3,240.00) 4050 Furnish and install 1 1/4" corporation and stop box; complete as specified Each 1.00 2.00 1.00 $1,050.00 $1,050.00 4055 Furnish and install water service clay dams; complete as specified Each 69.00 64.00 -5.00 $85.00 ($425.00) 4058 Furnish and install connections to existing 6" water main; complete as specified Each 8.00 8.00 $2,025.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 1.00 0.00 -1.00 $2,690.00 ($2,690.00) 4064 Furnish and install connections to existing 12" water main; complete as specified Each 3.00 3.00 $3,750.00 4101 Furnish and install 6" x 6" water main tee; complete as specified Each 1.00 1.00 $490.00 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 5.00 6.00 1.00 $690.00 $690.00 4111 Furnish and install 8" x 8" water main tee; complete as specified Each 3.00 3.00 $725.00 4129 Furnish and install 12" x 8" water main tee; complete as specified Each 1.00 2.00 1.00 $1,135.00 $1,135.00 4182 Furnish and install 6" x 8" water main cross; complete as specified Each 1.00 1.00 $915.00 4219 Furnish and install 8" 11 1/4 degree water main bend; complete as specified Each 2.00 1.00 -1.00 $415.00 ($415.00) 4228 Furnish and install 8" 22 1/2 degree water main bend; complete as specified Each 3.00 1.00 -2.00 $430.00 ($860.00) 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 27.00 10.00 -17.00 $335.00 ($5,695.00) Page 11 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 11.00 14.00 3.00 $435.00 $1,305.00 4239 Furnish and install 12" 45 degree water main bend; complete as specified Each 4.00 4.00 $900.00 4254 Furnish and install 6" water main cap; complete as specified Each 1.00 1.00 $186.00 4255 Furnish and install 8" water main cap; complete as specified Each 1.00 0.00 -1.00 $260.00 ($260.00) 4264 Furnish and install 8" x 6" water main reducer; complete as specified Each 7.00 7.00 $380.00 4352 Cut and cap existing 6" water main; complete as specified Each 2.00 3.00 1.00 $1,315.00 $1,315.00 4354 Cut and cap existing 8" water main; complete as specified Each 2.00 2.00 $1,390.00 4358 Cut and cap existing 12" water main; complete as specified Each 2.00 1.00 -1.00 $2,105.00 ($2,105.00) 4401 Furnish and install 6" water main gate valve; complete as specified Each 9.00 11.00 2.00 $1,965.00 $3,930.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 15.00 19.00 4.00 $2,710.00 $10,840.00 4404 Furnish and install 12" water main gate valve; complete as specified Each 2.00 2.00 $4,775.00 4447 Furnish and install 12" x 8" tapping valve and sleeve; complete as specified Each 1.00 1.00 $6,365.00 4500 Furnish and install hydrant; complete as specified Each 7.00 9.00 2.00 $5,600.00 $11,200.00 4712 Furnish and install 2" water main casing pipe; complete as specified Linear Feet 110.00 100.00 -10.00 $36.00 ($360.00) 4724 Furnish and install 16" water main casing pipe; complete as specified Linear Feet 30.00 30.00 $205.00 4920 Remove water main; complete as specified Linear Feet 515.00 346.00 -169.00 $22.00 ($3,718.00) 4990 Excavation special (water); complete as specified Tons 70.00 0.00 -70.00 $1.00 ($70.00) 4992 Bentonite slurry dam (water); complete as specified Each 5.00 4.00 -1.00 $1.00 ($1.00) Page 12 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5013 Furnish and install pull box (non-conductive); 18" x 36"; complete as specified Each 33.00 21.00 -12.00 $1,797.00 ($21,564.00) 5019 Furnish and install pull box non-conductive; 24" x 42"; complete as specified Each 5.00 2.00 -3.00 $2,660.00 ($7,980.00) 5025 Adjust pull box; complete as specified Each 37.00 23.00 -14.00 $1.00 ($14.00) 5051 Install CITY-supplied lighting control cabinet; complete as specified Each 1.00 1.00 $2,055.00 5054 Install electrical service; complete as specified Each 1.00 1.00 $2,310.00 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 3,280.00 0.00 -3,280.00 $10.25 ($33,620.00) 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 2,900.00 4,228.00 1328.00 $14.40 $19,123.20 5170 3" Schedule 40 PVC bore; including bore pits and utility line openings; complete as specified Linear Feet 260.00 0.00 -260.00 $2.55 ($663.00) 5230 Furnish and install 4 gauge red-coated wire; complete as specified Linear Feet 8,490.00 5,730.00 -2,760.00 $2.55 ($7,038.00) 5231 Furnish and install 4 gauge black-coated wire; complete as specified Linear Feet 8,490.00 5,730.00 -2,760.00 $2.55 ($7,038.00) 5252 Furnish and install 8 gauge green-coated wire; complete as specified Linear Feet 6,835.00 5,088.00 -1,747.00 $1.55 ($2,707.85) 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 1,440.00 805.00 -635.00 $0.85 ($539.75) 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 1,440.00 805.00 -635.00 $0.85 ($539.75) 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 1,440.00 805.00 -635.00 $0.85 ($539.75) 5380 Furnish and install fuse holder; complete as specified Each 72.00 46.00 -26.00 $56.50 ($1,469.00) 5386 Furnish and install 2A fuse; complete as specified Each 72.00 46.00 -26.00 $5.15 ($133.90) 5452 Install CITY-supplied 20' tapered pole with transformer base; complete as specified Each 36.00 23.00 -13.00 $565.00 ($7,345.00) Page 13 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985 CONTRACT 23-08 CHANGE ORDER #1 FINAL ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5458 Install CITY-supplied 10' truss-type luminaire arm; complete as specified Each 36.00 23.00 -13.00 $359.00 ($4,667.00) 5470 Install CITY-supplied cobra head luminaire; complete as specified Each 36.00 23.00 -13.00 $205.00 ($2,665.00) 5504 Furnish and install TYPE 5 base; complete as specified Each 36.00 23.00 -13.00 $1,001.00 ($13,013.00) 5506 Furnish and install TYPE 9 base; complete as specified Each 1.00 1.00 $2,055.00 SECTION I (BID ITEMS 1010 - 5506) - SUBTOTAL: $139,594.00 ($616,033.80) NET DECREASE TO SECTION I: ($476,439.80) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10001 Profile saw cut curb; complete as specified Linear Feet 0.00 11.00 11.00 $57.50 $632.50 1-20001 Furnish and install silt fence; complete as specified Linear Feet 0.00 300.00 300.00 $4.00 $1,200.00 1-30001 Furnish and install bentonite dam at 915 Bauman Street; complete as specified Lump Sum 0.00 1.00 1.00 $3,300.57 $3,300.57 $5,133.07 $0.00 $5,133.07 NET DECREASE TO SECTION I: ($476,439.80) $5,133.07 NET DECREASE TO CONTRACT: ($471,306.73) ADDITIONAL WORK REQUIRED: CO #1 NET INCREASE TO ADDITIONAL WORK: NET INCREASE: ADDITIONAL WORK REQUIRED: CO #1 (ITEMS 1-10001 - 1-30001) SUBTOTAL: Page 14 of 14 Docusign Envelope ID: 2F06B704-E1B6-45BE-8A96-2159A49CC985