Loading...
HomeMy WebLinkAbout0109144-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 928 WINDWARD CT Contractor CROSS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner WALTER C/MAXINE DOEMEL REVTRUST Category 411 - Residential-Water Heaters No Create Date Plan 109144 07/07/2004 Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp Lavatory 0 LndryTray 0 Local Waste 0 Wait. St. 0 Shamp Sink. 0 Coffee Maker Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Ict Grease Trap Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap Sar Sink 0 Dishwasher 0 Seer Tap 0 SculrySink 0 Wash Ftn 0 RPZ Valve Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 0 0 0 0 0 0 0 Use/Nature of Work REPLACE GAS WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $400.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoidedJ Issued By Parcelld # 1522410000 Date 07/07/2004 In the performance of this work, I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit appiicent to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent~Owner Address PO BOX 65 LARSEN WI 54947 - 0000 Telephone Number 920-303-1255 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.