Loading...
HomeMy WebLinkAbout0109401-Plumbing (water heater)OSHKOSH ON THE WATER JobAddress 912ANCHORAGE CT Contractor RAPID SOFT LLC Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 CITY OF OSHKOSH No '109401 PLUMBING PERMIT - APPLICATION AND RECORD Owner MICHAEL W/LYNN PAGEL Create Date 07/19/2004 Category 411 - Residential-Water Heaters Plan Water Heater Site Drain Roof Drain Use/Nature of Work Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker LndryStndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 REPLACE NG WTR HTR FOR SEARS Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $600.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit VoidedI Parcel Id # 1519650000 Date 07/19/2004 in the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applicefion within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature Date Address P.O. BOX 4052 Agent/Owner APPLETON WI 54915 - 0052 Telephone Number 920-757-6432 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.