HomeMy WebLinkAbout0109401-Plumbing (water heater)OSHKOSH
ON THE WATER
JobAddress 912ANCHORAGE CT
Contractor RAPID SOFT LLC
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
CITY OF OSHKOSH No '109401
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MICHAEL W/LYNN PAGEL Create Date 07/19/2004
Category 411 - Residential-Water Heaters Plan
Water Heater
Site Drain
Roof Drain
Use/Nature
of Work
Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain
Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp
Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
LndryStndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap
Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve
1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn
0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
REPLACE NG WTR HTR FOR SEARS
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Valuation $600.00 Plan Approval $0.00 Permit Fees
Issued By
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] Permit VoidedI
Parcel Id #
1519650000
Date 07/19/2004
in the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit applicefion within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starling such activity.
Signature Date
Address P.O. BOX 4052
Agent/Owner
APPLETON
WI 54915 - 0052 Telephone Number 920-757-6432
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.