HomeMy WebLinkAbout2004-Plumbing (tub-upper unit)OSHKOSH
ON THE WATER
Job Addraas 1019 WRIGHT ST
Contractor D.R. HANSEN PLBG~
CITY OF OSHKOSH No 109407
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JOHN L SULLIVAN Create Date 07/20/2004
Category 410 - Residential-interior Plan
Bathtub 1 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp
Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap --
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap --
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn --
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature REPLACE UPPER UNIT BATHTUB
of Work
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
0
0
0
0
0
0
0
0
0
0
Conn. Type
0
0
0
0
0
Valuation $1,200.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoidedI
Issued By
Parcelld #
0501590000
Date 07/20/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 55 KNAPP ST
Agent~Owner
OSHKOSH WI 54902 - 0000 Telephone Number 233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.