Loading...
HomeMy WebLinkAbout0109557-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 2003 MOUNT VERNON ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner ELLEN I BEFUS Category 411 - Residential-Water Heatem Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 LocalWaste 0 Wait. St. 0 Shamp Sink __ Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No Create Date Plan 109557 07/23/2004 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Iht Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn __ 0 0 0 0 0 0 0 0 0 Use/Nature of Work iNSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type Valuation $450.00 Plan Approval $0.00 Permit Fees Issued By # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided J Parcel Id # 1515420000 Date 07/23/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessa~' approvals before starting such activity. Signature Date Agent/Owner Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5i28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.