HomeMy WebLinkAbout0109556-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 1317 OTTER AVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner SCOTT R JONES
Category 411 - Residential-Water Heatem
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater I Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
0 Ejector/Grind 0 DipWell 0 F Prep Sink
0 Water Softner 0 Drink Ftn 0 Serv Sink
0 Local Waste 0 Wait. St. 0 Shamp Sink __
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __
0 Bidet 0 Exam Sink 0 Catch Basin __
0 Beer Tap 0 SculrySink 0 Wash Ftn
0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 Plaster Sink 0 Standp Rec __
0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 109556
Create Date 07/23/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Iht GreaseTrap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 EyeWash Statn 0
0
0
Use/Nature
of Work
INSTALL NG WTR HTR
Valuation
Issued By
Sani~rySewer
Storm Sewer
Wa~rSe~ice
Size Material Type
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$450.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided J
Parcelld #
0802910000
Date 07/23/2004
In the performance of this work, I agree to perform all work pursuant to roles governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 23%9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.