Loading...
HomeMy WebLinkAbout0109543-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 685 W 8TH AVE Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump __ Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH No 109543 PLUMBING PERMIT - APPLICATION AND RECORD Owner ROBERT H/DORIS FRANK Create Date 07/22/2004 Category 411 - Residential-Water Heaters Plan 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Water Soffner 0 Drink Ftn 0 ServSink 0 Soda Disp 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap __ 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap __ 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn __ 0 Lab Sink 0 Piaster Sink 0 StandpRec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 0 0 0 0 0 0 0 Use/Nature of Work INSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type Valuation $450.00 Pian Approval $0.00 Permit Fees Issued By # ConmType 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided J Parcel Id # 0601330000 Date 07/23/2004 In the performance of this work, J agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before star~in9 such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.