HomeMy WebLinkAbout0109538-Plumbing (sump pump)OSHKOSH
ON THE WATER
Job Address 1322 MENOMINEE DR
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner JAMES H BARBOUR
Category 410- Residential-Interior
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
No 109538
Create Date 07/22/2004
Plan
0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain
0 Water Softner 0 DrinkFtn 0 ServSink 0 Soda Disp
0 LocalWaste 0 Wait. St. 0 ShampSink 0 Coffee Maker
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve
I Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
INSTALL SUMP PUMP
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$400.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Parcelld #
1513310000
Date 07/23/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starling such activity.
Signature Date
Address 522 W. MURDOCKAVE
AgentrOwner
OSHKOSH WI 54901 ~ 2298 Telephone Number 231-9580
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.