Loading...
HomeMy WebLinkAbout0109538-Plumbing (sump pump)OSHKOSH ON THE WATER Job Address 1322 MENOMINEE DR Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JAMES H BARBOUR Category 410- Residential-Interior Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink No 109538 Create Date 07/22/2004 Plan 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Water Softner 0 DrinkFtn 0 ServSink 0 Soda Disp 0 LocalWaste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve I Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work INSTALL SUMP PUMP Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $400.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Parcelld # 1513310000 Date 07/23/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature Date Address 522 W. MURDOCKAVE AgentrOwner OSHKOSH WI 54901 ~ 2298 Telephone Number 231-9580 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.