HomeMy WebLinkAbout2004-Plumbing (2 toilets)OSHKOSH
ON THE WATER
Job Address 1112 t 114 MALLARD AVE
Contractor SAMMONS PLUMBING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 2 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Claserm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
Owner CRAIG R TANNER
Category 410 - Residential-Interior
0 Ejector/Grind 0 DipWell 0 F Prep Sink
0 Water Softner 0 Drink Ftn 0 Serv Sink
0 Local Waste 0 Wait. St. 0 Shamp Sink
0 Clothes Wshr 0 Ice Chest 0 Fir/Wst Sink
0 Bidet 0 Exam Sink 0 Catch Basin
0 Beer Tap 0 SculrySink 0 Wash Ftn
0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 Plaster Sink 0 Standp Rec
0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 109525
Create Date 07/22/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Int GreaseTrap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 EyeWash Statn 0
0
0
Use/Nature
of Work
2 FAMILY INSTALL 2 TOILETS AT 1 t 14 MALLARD
Sanitary Sewer
Storm Sewer
Water Service
Size
Valuation $300.00 Plan Approval $0.00 Permit Fees
Issued By
Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] PermitVoidedI
Parcel Id #
1522750000
Date 07/23/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a par[y, if you perform the work
described in this permit app]icefion within an easement, the City strongly urges the permit applicant to centac'~ the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.