Loading...
HomeMy WebLinkAbout0109522-Plumbing (toilet)OSHKOSH ON THE WATER Job Address 237 W 6TH AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH No 109522 PLUMBING PERMIT - APPLICATION AND RECORD Owner TERRY L ZEH Create Date 07/22/2004 Category 420 - Residential-Other Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 1 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump __ Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 WaterSoftner 0 DrinkFtn 0 ServSink 0 Soda Disp 0 0 LocalWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 0 Clothes Wshr 0 Ice Chest 0 FIr/~Nst Sink 0 Iht Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 BeerTap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work INSTALL TOILET Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type Valuation $200.00 Plan Approval $0.00 Permit Fees Issued By 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoidedI Parcel Id # 0900070000 Date 07/23/2004 In the performance of this work, I agree to perform all work pumuant to roles governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in thin permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before sta~ing such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5t 28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.