HomeMy WebLinkAbout2004-Plumbing (sump pump)OSHKOSH
ON THE WATER
Job Address 1850 WALNUT ST
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner TIMOTHY J/PAULA CORNELL
Category 410 - Residential-lntedoi'
No 109513
Create Date 07/22/2004
Plan
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Ledry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
Use/Nature
of Work
0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
1 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0
0 LabSink 0 Plaster Sink 0 StandpRec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
INSTALL SUMP PUMP
Sanitary Sewer
Storm Sewer
Water Service
Valuation $200.00 Plan Approval
Issued By
Size Material Type #
$0.00 Permit Fees
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] PermitVoidedI
Parcelld #
1221100000
Date 07/23/2004
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH Wi 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request Pine at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.