Loading...
HomeMy WebLinkAbout2004-Plumbing (sump pump)OSHKOSH ON THE WATER Job Address 1850 WALNUT ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner TIMOTHY J/PAULA CORNELL Category 410 - Residential-lntedoi' No 109513 Create Date 07/22/2004 Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Ledry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink Use/Nature of Work 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 1 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0 0 LabSink 0 Plaster Sink 0 StandpRec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 INSTALL SUMP PUMP Sanitary Sewer Storm Sewer Water Service Valuation $200.00 Plan Approval Issued By Size Material Type # $0.00 Permit Fees Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoidedI Parcelld # 1221100000 Date 07/23/2004 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH Wi 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request Pine at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.