Loading...
HomeMy WebLinkAbout0109512-Plumbing (sump pump)OSHKOSH ON TIlE WATER Job Address 1219 BISMARCK AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner ANDREW J RATCHMAN Category 4.10 - Residential-Interior Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink Whidpoct 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 0 Sump Pump 1 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 109512 Create Date 07/21/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext GreaseTrap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Natura of Work INSTALL SUMP PUMP Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $200.00 Plan Approval $0.00 Permit Fees Issued By $20.00 [] Permit Voided Parcel Id # 0609920000 Date 07/23/2004 In the performance of this work, I agree to perform all work pumuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 23%9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.