HomeMy WebLinkAbout0109512-Plumbing (sump pump)OSHKOSH
ON TIlE WATER
Job Address 1219 BISMARCK AVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ANDREW J RATCHMAN
Category 4.10 - Residential-Interior
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink
Whidpoct 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink
Lavatory 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink
Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn
Water Heater 0 Sump Pump 1 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 109512
Create Date 07/21/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Iht Grease Trap 0
0 Ext GreaseTrap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Natura
of Work
INSTALL SUMP PUMP
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $200.00 Plan Approval $0.00 Permit Fees
Issued By
$20.00 [] Permit Voided
Parcel Id #
0609920000
Date 07/23/2004
In the performance of this work, I agree to perform all work pumuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 23%9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.