HomeMy WebLinkAbout0109510-Plumbing (kitchen sink/dishwasher)OSHKOSH
ON THE WATER
Job Addreee 1032 DURFEE AVE
Contractor SAMMONS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
CITY OF OSHKOSH No 109510
PLUMBING PERMIT - APPLICATION AND RECORD
Owner GERALD J BAUER ETAL Create Date 07/21/2004
Category 410 - Residential-interior Plan
0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
0 Floor Drain 0 WaterSoftner 0 Drink Ftn 0 ServSink 0 Soda Disp 0
0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Iht Grease Trap 0
0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0
0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
PULL & REINSTALL KIT SNK & INSTALL DISHWASHER
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$500.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided J
Parcel Id #
0607340000
Date 07/23/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necaesary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.