Loading...
HomeMy WebLinkAbout04-430.doc NOVEMBER 23, 2004 04-430 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN PURPOSE: CHANGE ORDER NO.1, PUBLIC WORKS CONTRACT NO. 04-06 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FISCHER-ULMAN CONSTRUCTION, INC. 1115 S. Theodore Street Appleton, WI 54915 Net Increase to contract: $22,923.42 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Accl. No. 311-0410-7480-00000 - Sidewalk Construction Fund Expenditures Accl. No. 317-0410-7480-03304 - Special Assessments - Sidewalks Accl. No. 541-1867-6401-08673 - Water Utility - Maintenance of Mains Accl. No. 541-1867-6401-08675 - Water Utility - Maintenance of Services ~ CHANGE ORDER # 1 Dated: November 10, 2004 TO: Fischer-Ulman Construction, Inc. 1115 S. Theodore Street Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. 04-06, is hereby amended and changed as follows: NET INCREASE TO SECTION 1- SIDEWALK REHAB $22,923.42 $22,923.42 NET INCREASE TO CONTRACT: CITY OF OSHKOSH BY: City Manager Recommended: ~dG. City Clerk Approved and accepted: '1#~~~Uøø- Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 04-06 CHANGE ORDER #1 SECTION I . SIDEWALK REHAB DESCRIPTION INCREASE IN COST PER UNIT CONTRACT PRICE DECREASE IN CONTRACT PRiCE 1 Approx. 74,000 square feet of sidewalk removal & driveway removal, complete as specified, per square foot 74,000.00 85,515.14 11,515.14 $0.30 $3,454.54 2 Approx. 3,000 linear feet of concrete/asphalt sawing, complete as specified, per linear foot 3,000.00 4,347.40 1,347.40 $2.00 $2,694.80 3 Construct approx. 86,000 square feet of 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot 86,000.00 83,518.91 -2,481.09 $2.25 ($5,582.45) 4 Approx. 18,000 square feet of 4" thick concrete sidewalk 7' wide (Jackson Street/Pearl Avenue), per square foot 18,000.00 4,067.00 -13,933.00 $1.95 ($27,169.35) 5 Construct approx. 11 ,000 square feet of 6"thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot 11,000.00 15,649.15 4,649.15 $2.86 $13,296.57 6 Construct. approx. 2,500 square feet of 6" thick textured concrete wheel chair ramps, complete as specified, per square foot 2,500.00 2,282.71 -217.29 $3.20 ($695.33) Page 1 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE PRICE 7 Approx. 1,500 square feet of three (3") inch asphalt replacement, complete as specified, per square foot 1,500.00 3,262.45 1,762.45 $2.60 $4,582.37 8 Approx. 250 linear feet of curb and gutter removal, complete as specified, per linear foot 250.00 316.50 66.50 $3.00 $199.50 9 Approx. 300 linear feet of 30" curb and gutter, complete as specified, per linear foot 300.00 474.40 174.40 $14.20 $2,476.48 10 Approx. 300 square yards of terrace restoration, including seed, fertilize, and mulch, complete as specified, per square yard 300.00 603.40 303.40 $3.10 $940.54 11 Furnish and install approx. 50 pavement ties, complete as specified, each 50.00 78.00 28.00 $7.00 $196.00 12 Construct approx. 3,000 square feet of 4" thick concrete sidewalk in Water Dept. repair locations at approx. 40 sites, complete as specified, per square foot 3,000.00 3,891.29 891.29 $3.30 $2,941.26 13 Construct approx. 1,000 square feet of 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified, per square foot 1,000.00 1,188.00 188.00 $3.70 $695.60 Page 2 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE PRICE '" ,. 14 Approx. 100 square yards of 7" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 100.00 -100.00 $34.55 ($3,455.00) 15 Appröx. 1,200 square yards of 8" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 1,200.00 1 ,084.58 . -115.42 $34.00 ($3,924.28 16 Approx. 500 square yards of 8" special High Early Strength, non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, complete as specified, per square yard 500.00 284.49 -215.51 $37.00 ($7,973.87\ 17 Approx. 250 tons extra crushed stone base, complete as specified, per ton 250.00 225.47 -24.53 $10.00 ($245.30) Page 3 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN DESCRIPTION COST PER UNIT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE 18 Approx. 1,200 linear feet of No.4 epoxy- coated reinforcement rods, installed as specified, per lin. ft. 1,200.00 961.00 -239.00 $1.50 ($358.50) 19 Provide $1,500 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $1,500.00 SECTION I- (BID ITEMS 1 -19) - SUB-TOTALS $31,477.66 ($49,404.08) ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION I - CONCRETE PAVING ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN DESCRIPTION COST PER UNIT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE 1 9" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 232.59 232.59 $37.50 $8,722.13 2 9" 7-bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 78.32 78.32 $39.00 $3,054.48 Page 4 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN DESCRIPTION COST PER UNIT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE 3 9" 9-bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 112.89 112.89 $40.50 $4,572.05 4 8" 7-bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 445.88 445.88 '" ,. $36.00 $16,051.68 5 9" thick concrete sidewalk in Water Dept. repair location, complete as ~ , specified, per square foot 443.75 443.75 $4.40 $1,952.50 6 Miscellaneous extras (Le. brick, mortar, clean out inlet), lump sum $350.00 $350.00 7 Installation of modular block walls on Sawyer Street (includes block w/top cap, backfill, topsoil, seed, fertilizer, mulch and traffic control), lump sum $6,147.00 $6,147.00 ADDITIONAL WORK: C.O. # 1 . (ITEMS 1.6) . SUB.TOTAL $40,849.84 $0.00 NET INCREASE TO SECTION I - $22,923.42 Page 5 DESCRIPTION CONTRACT QUANTITIES CONTRACT: 04-06 CHANGE ORDER #1 NET INCREASE ~T I~REASEW DECREASE COST PER UNIT CONTRACT PRICE NET INCREASE TO SECTIONS I, II, 111, IV NET DECREASE TO SECTIONS I, II, III, IV $72,327.50 ($49,404.08) NET INCREASE TO CONTRACT: $22,923.42 Page 6 DECREASE IN CONTRACT PRICE " CHANGE ORDER # 1 Dated: November 10, 2004 TO: Fischer-Ulman Construction, Inc. 1115 S. Theodore Street Appleton, WI 54915 Your present contract with the City of Oshkosh, Contract No. 04-06, is hereby amended and changed as follows: NET INCREASE TO SECTION I - SIDEWALK REHAB $22,923.42 NET INCREASE TO CONTRACT: $22,923.42 CITY OF OSHKOSH BY: Recommended: ~cJG. City Manager City Clerk Approved and accepted: . J#Æ~ þ J¿~ Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 04-06 CHANGE ORDER #1 SECTION I . SIDEWALK REHAB DESCRIPTION INCREASE IN COST PER UNIT CONTRACT PRICE DECREASE IN CONTRACT PRICE 1 Approx. 74,000 square feet of sidewalk removal & driveway removal, complete as specified, per square foot 74,000.00 85,515.14 11,515.14 . $0.30 $3,454.54 2 Approx. 3,000 linear feet of concrete/asphalt sawing, complete as specified, per linear foot 3,000.00 4,347.40 1,347.40 $2.00 $2,694.80 3 Construct approx. 86,000 square feet of 4" thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot 86,000.00 83,518.91 -2,481.09 $2.25 ($5,582.45) 4 Approx. 18,000 square feet of 4" thick concrete sidewalk 7' wide (Jackson Street/Pearl Avenue), per square foot 18,000.00 4,067.00 -13,933.00 $1.95 ($27,169.35\ 5 Construct approx. 11,000 square feet of 6"thick concrete sidewalk in various locations in the City of Oshkosh, complete as specified, per square foot 11,000.00 15,649.15 4,649.15 $2.86 $13,296.57 6 Construct,approx. 2,500 square feet of 6" thick textured concrete wheel chair ramps, complete as specified, per square foot 2,500.00 2,282.71 -217.29 $3.20 ($695.33) Page 1 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE PRICE 7 Approx. 1,500 square feet of three (3") inch asphalt replacement, complete as specified, per square foot 1,500.00 3,262.45 1,762.45 $2.60 $4,582.37 8 Approx; 250 linear feet of curb and gutter removal, complete as specified, per linear foot 250.00 316.50 66.50 $3.00 $199.50 9 Approx. 300 linear feet of 30" curb and gutter, complete as specified, per linear foot 300.00 474.40 174.40 $14.20 $2,476.48 10 Approx. 300 square yards of terrace restoration, including seed, fertilize, and mulch, complete as specified, per square yard 300.00 603.40 303.40 $3.10 $940.54 11 Furnish and install approx. 50 pavement ties. complete as specified, each 50.00 78.00 28.00 $7.00 $196.00 12 Construct approx. 3,000 square feet of 4" thick concrete sidewalk in Water Dept. repair locations at approx. 40 sites, complete as specified, per square foot 3,000.00 3,891.29 891.29 $3.30 $2,941.26 13 Construct approx. 1,000 square feet of 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified, per square " foot 1,000.00 1,188.00 188.00 $3.70 $695.60 Page 2 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE PRICE '," " 14 Approx. 100 square yards of 7" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb &" grading, terracing & traffic control, complete as specified, per square yard 1 00.00 -100.00 $34.55 ($3,455.00) 15 Appröx. 1,200 square yards of 8" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 1,200.00 1,084.58 -115.42 $34.00 ($3,924.28) 16 Approx. 500 square yards of 8" special High Early Strength, non-reinforced concrete pavement removal and replacement, including sawing, ' pavement ties, integral curb and grading, terracing and traffic control, complete as specified, per square yard 500.00 284.49 -215.51 $37.00 ($7,973.87' 17 Approx. 250 tons extra crushed stone base, complete as specified, per ton 250.00 225.47 -24.53 $10.00 ($245.30) Page 3 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE PRICE 18 Approx. 1,200 linear feet of No.4 epoxy- coated reinforcement rods, installed as specified, per lin. ft. 1,200.00 961.00 -239.00 $1.50 ($358.50) 19 Provide $1,500 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 1.00 $1,500.00 SECTION 1- (BID ITEMS 1 -19) - SUB-TOTALS ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION I - CONCRETE PAVING $31,477.66 ($49,404.08) ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE PRICE 1 9" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 232.59 ' . 232.59 $37.50 $8,722.13 2 9" 7-bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 78.32 78.32 $39.00 $3,054.48 Page 4 CONTRACT: 04-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRIC¡;: PRICE 3 9" 9-bag non- reinforced concrete pavement removal and replacement, including sawin£!, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 112.89 112.89 $40.50 $4,572.05 4 8" 7-bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 445.88 445.88 $36.00 $16,051.68 5 9" thick concrete sidewalk in Water Dept. repair location, complete as specified, per square foot 443.75 443.75 $4.40 $1,952.50 6 Miscellaneous extras (i.e. brick, mortar, clean out inlet), lump sum $350.00 $350.00 7 Installation of modular block walls on Sawyer Street (includes block w/top cap, backfill, topsoil, seed, fertilizer, mulch and traffic control), lump sum $6,147.00 $6,147.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 .6) - SUB-TOTAL $40,849.84 $22,923.42 $0.00 NET INCREASE TO SECTION I - Page 5 , ' ITEM ,NUMBER DESCRIPTION CONTRACT QUANTITIES CONTRACT: 04-06 CHANGE ORDER #1 INSTALLED QUANTITIES NET INCREASE IN DECREASE COST PER UNIT CONTRACT PRICE NET INCREASE TO SECTIONS I, II, III, IV NET DECREASE TO SECTIONS I, II, III, IV $72,327.50 ($49,404.08) NET INCREASE TO CONTRACT: $22,923.42 Page 6 DECREASE IN CONTRACT PRICE