HomeMy WebLinkAbout04-430.doc
NOVEMBER 23, 2004
04-430
RESOLUTION
(CARRIED
7-0
LOST
LAID OVER
WITHDRAWN
PURPOSE:
CHANGE ORDER NO.1, PUBLIC WORKS CONTRACT NO. 04-06
INITIATED BY:
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
FISCHER-ULMAN CONSTRUCTION, INC.
1115 S. Theodore Street
Appleton, WI 54915
Net Increase to contract:
$22,923.42
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Accl. No. 311-0410-7480-00000 - Sidewalk Construction Fund Expenditures
Accl. No. 317-0410-7480-03304 - Special Assessments - Sidewalks
Accl. No. 541-1867-6401-08673 - Water Utility - Maintenance of Mains
Accl. No. 541-1867-6401-08675 - Water Utility - Maintenance of Services
~
CHANGE ORDER # 1
Dated: November 10, 2004
TO: Fischer-Ulman Construction, Inc.
1115 S. Theodore Street
Appleton, WI 54915
Your present contract with the City of Oshkosh, Contract No. 04-06, is hereby amended
and changed as follows:
NET INCREASE TO SECTION 1- SIDEWALK REHAB
$22,923.42
$22,923.42
NET INCREASE TO CONTRACT:
CITY OF OSHKOSH
BY:
City Manager
Recommended:
~dG.
City Clerk
Approved and accepted:
'1#~~~Uøø-
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 04-06 CHANGE ORDER #1
SECTION I . SIDEWALK REHAB
DESCRIPTION
INCREASE IN
COST PER UNIT CONTRACT
PRICE
DECREASE IN
CONTRACT PRiCE
1 Approx. 74,000
square feet of
sidewalk removal &
driveway removal,
complete as
specified, per square
foot 74,000.00 85,515.14 11,515.14 $0.30 $3,454.54
2 Approx. 3,000 linear
feet of
concrete/asphalt
sawing, complete as
specified, per linear
foot 3,000.00 4,347.40 1,347.40 $2.00 $2,694.80
3 Construct approx.
86,000 square feet of
4" thick concrete
sidewalk in various
locations in the City
of Oshkosh,
complete as
specified, per square
foot 86,000.00 83,518.91 -2,481.09 $2.25 ($5,582.45)
4 Approx. 18,000
square feet of 4"
thick concrete
sidewalk 7' wide
(Jackson
Street/Pearl
Avenue), per square
foot 18,000.00 4,067.00 -13,933.00 $1.95 ($27,169.35)
5 Construct approx.
11 ,000 square feet of
6"thick concrete
sidewalk in various
locations in the City
of Oshkosh,
complete as
specified, per square
foot 11,000.00 15,649.15 4,649.15 $2.86 $13,296.57
6 Construct. approx.
2,500 square feet of
6" thick textured
concrete wheel chair
ramps, complete as
specified, per square
foot
2,500.00 2,282.71 -217.29 $3.20 ($695.33)
Page 1
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
7 Approx. 1,500
square feet of three
(3") inch asphalt
replacement,
complete as
specified, per square
foot 1,500.00 3,262.45 1,762.45 $2.60 $4,582.37
8 Approx. 250 linear
feet of curb and
gutter removal,
complete as
specified, per linear
foot 250.00 316.50 66.50 $3.00 $199.50
9 Approx. 300 linear
feet of 30" curb and
gutter, complete as
specified, per linear
foot 300.00 474.40 174.40 $14.20 $2,476.48
10 Approx. 300 square
yards of terrace
restoration, including
seed, fertilize, and
mulch, complete as
specified, per square
yard
300.00 603.40 303.40 $3.10 $940.54
11 Furnish and install
approx. 50 pavement
ties, complete as
specified, each
50.00 78.00 28.00 $7.00 $196.00
12 Construct approx.
3,000 square feet of
4" thick concrete
sidewalk in Water
Dept. repair locations
at approx. 40 sites,
complete as
specified, per square
foot 3,000.00 3,891.29 891.29 $3.30 $2,941.26
13 Construct approx.
1,000 square feet of
6" thick concrete
sidewalk in Water
Dept. repair locations
at approx. 20 sites,
complete as
specified, per square
foot 1,000.00 1,188.00 188.00 $3.70 $695.60
Page 2
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE '" ,.
14 Approx. 100 square
yards of 7"
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 100.00 -100.00 $34.55 ($3,455.00)
15 Appröx. 1,200
square yards of 8"
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 1,200.00 1 ,084.58 . -115.42 $34.00 ($3,924.28
16 Approx. 500 square
yards of 8" special
High Early Strength,
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb and
grading, terracing
and traffic control,
complete as
specified, per square
yard 500.00 284.49 -215.51 $37.00 ($7,973.87\
17 Approx. 250 tons
extra crushed stone
base, complete as
specified, per ton 250.00 225.47 -24.53 $10.00 ($245.30)
Page 3
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
DESCRIPTION COST PER UNIT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE
18 Approx. 1,200 linear
feet of No.4 epoxy-
coated reinforcement
rods, installed as
specified, per lin. ft.
1,200.00 961.00 -239.00 $1.50 ($358.50)
19 Provide $1,500 to
the City of Oshkosh
for project
management
communications,
complete as
specified, lump sum
1.00 1.00 $1,500.00
SECTION I- (BID ITEMS 1 -19) - SUB-TOTALS
$31,477.66
($49,404.08)
ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION I - CONCRETE PAVING
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
DESCRIPTION COST PER UNIT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE
1 9" non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 232.59 232.59 $37.50 $8,722.13
2 9" 7-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 78.32 78.32 $39.00 $3,054.48
Page 4
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
DESCRIPTION COST PER UNIT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE
3 9" 9-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 112.89 112.89 $40.50 $4,572.05
4 8" 7-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 445.88 445.88 '" ,. $36.00 $16,051.68
5 9" thick concrete
sidewalk in Water
Dept. repair location,
complete as ~ ,
specified, per square
foot 443.75 443.75 $4.40 $1,952.50
6 Miscellaneous extras
(Le. brick, mortar,
clean out inlet), lump
sum $350.00 $350.00
7 Installation of
modular block walls
on Sawyer Street
(includes block w/top
cap, backfill, topsoil,
seed, fertilizer, mulch
and traffic control),
lump sum
$6,147.00 $6,147.00
ADDITIONAL WORK: C.O. # 1 . (ITEMS 1.6) . SUB.TOTAL
$40,849.84
$0.00
NET INCREASE TO SECTION I -
$22,923.42
Page 5
DESCRIPTION
CONTRACT
QUANTITIES
CONTRACT: 04-06 CHANGE ORDER #1
NET
INCREASE
~T I~REASEW
DECREASE COST PER UNIT CONTRACT
PRICE
NET INCREASE TO SECTIONS I, II, 111, IV
NET DECREASE TO SECTIONS I, II, III, IV
$72,327.50
($49,404.08)
NET INCREASE TO CONTRACT:
$22,923.42
Page 6
DECREASE IN
CONTRACT PRICE
"
CHANGE ORDER # 1
Dated: November 10, 2004
TO: Fischer-Ulman Construction, Inc.
1115 S. Theodore Street
Appleton, WI 54915
Your present contract with the City of Oshkosh, Contract No. 04-06, is hereby amended
and changed as follows:
NET INCREASE TO SECTION I - SIDEWALK REHAB
$22,923.42
NET INCREASE TO CONTRACT:
$22,923.42
CITY OF OSHKOSH
BY:
Recommended:
~cJG.
City Manager
City Clerk
Approved and accepted:
. J#Æ~ þ J¿~
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 04-06 CHANGE ORDER #1
SECTION I . SIDEWALK REHAB
DESCRIPTION
INCREASE IN
COST PER UNIT CONTRACT
PRICE
DECREASE IN
CONTRACT PRICE
1 Approx. 74,000
square feet of
sidewalk removal &
driveway removal,
complete as
specified, per square
foot 74,000.00 85,515.14 11,515.14 . $0.30 $3,454.54
2 Approx. 3,000 linear
feet of
concrete/asphalt
sawing, complete as
specified, per linear
foot 3,000.00 4,347.40 1,347.40 $2.00 $2,694.80
3 Construct approx.
86,000 square feet of
4" thick concrete
sidewalk in various
locations in the City
of Oshkosh,
complete as
specified, per square
foot 86,000.00 83,518.91 -2,481.09 $2.25 ($5,582.45)
4 Approx. 18,000
square feet of 4"
thick concrete
sidewalk 7' wide
(Jackson
Street/Pearl
Avenue), per square
foot 18,000.00 4,067.00 -13,933.00 $1.95 ($27,169.35\
5 Construct approx.
11,000 square feet of
6"thick concrete
sidewalk in various
locations in the City
of Oshkosh,
complete as
specified, per square
foot 11,000.00 15,649.15 4,649.15 $2.86 $13,296.57
6 Construct,approx.
2,500 square feet of
6" thick textured
concrete wheel chair
ramps, complete as
specified, per square
foot
2,500.00 2,282.71 -217.29 $3.20 ($695.33)
Page 1
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
7 Approx. 1,500
square feet of three
(3") inch asphalt
replacement,
complete as
specified, per square
foot 1,500.00 3,262.45 1,762.45 $2.60 $4,582.37
8 Approx; 250 linear
feet of curb and
gutter removal,
complete as
specified, per linear
foot 250.00 316.50 66.50 $3.00 $199.50
9 Approx. 300 linear
feet of 30" curb and
gutter, complete as
specified, per linear
foot 300.00 474.40 174.40 $14.20 $2,476.48
10 Approx. 300 square
yards of terrace
restoration, including
seed, fertilize, and
mulch, complete as
specified, per square
yard
300.00 603.40 303.40 $3.10 $940.54
11 Furnish and install
approx. 50 pavement
ties. complete as
specified, each
50.00 78.00 28.00 $7.00 $196.00
12 Construct approx.
3,000 square feet of
4" thick concrete
sidewalk in Water
Dept. repair locations
at approx. 40 sites,
complete as
specified, per square
foot 3,000.00 3,891.29 891.29 $3.30 $2,941.26
13 Construct approx.
1,000 square feet of
6" thick concrete
sidewalk in Water
Dept. repair locations
at approx. 20 sites,
complete as
specified, per square "
foot 1,000.00 1,188.00 188.00 $3.70 $695.60
Page 2
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE '," "
14 Approx. 100 square
yards of 7"
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &"
grading, terracing &
traffic control,
complete as
specified, per square
yard 1 00.00 -100.00 $34.55 ($3,455.00)
15 Appröx. 1,200
square yards of 8"
non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 1,200.00 1,084.58 -115.42 $34.00 ($3,924.28)
16 Approx. 500 square
yards of 8" special
High Early Strength,
non-reinforced
concrete pavement
removal and
replacement,
including sawing, '
pavement ties,
integral curb and
grading, terracing
and traffic control,
complete as
specified, per square
yard 500.00 284.49 -215.51 $37.00 ($7,973.87'
17 Approx. 250 tons
extra crushed stone
base, complete as
specified, per ton 250.00 225.47 -24.53 $10.00 ($245.30)
Page 3
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
18 Approx. 1,200 linear
feet of No.4 epoxy-
coated reinforcement
rods, installed as
specified, per lin. ft.
1,200.00 961.00 -239.00 $1.50 ($358.50)
19 Provide $1,500 to
the City of Oshkosh
for project
management
communications,
complete as
specified, lump sum
1.00 1.00 $1,500.00
SECTION 1- (BID ITEMS 1 -19) - SUB-TOTALS
ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION I - CONCRETE PAVING
$31,477.66
($49,404.08)
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRICE
PRICE
1 9" non-reinforced
concrete pavement
removal and
replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 232.59 ' . 232.59 $37.50 $8,722.13
2 9" 7-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 78.32 78.32 $39.00 $3,054.48
Page 4
CONTRACT: 04-06 CHANGE ORDER #1
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COST PER UNIT CONTRACT CONTRACT PRIC¡;:
PRICE
3 9" 9-bag non-
reinforced concrete
pavement removal
and replacement,
including sawin£!,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 112.89 112.89 $40.50 $4,572.05
4 8" 7-bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as
specified, per square
yard 445.88 445.88 $36.00 $16,051.68
5 9" thick concrete
sidewalk in Water
Dept. repair location,
complete as
specified, per square
foot 443.75 443.75 $4.40 $1,952.50
6 Miscellaneous extras
(i.e. brick, mortar,
clean out inlet), lump
sum $350.00 $350.00
7 Installation of
modular block walls
on Sawyer Street
(includes block w/top
cap, backfill, topsoil,
seed, fertilizer, mulch
and traffic control),
lump sum
$6,147.00 $6,147.00
ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 .6) - SUB-TOTAL
$40,849.84
$22,923.42
$0.00
NET INCREASE TO SECTION I -
Page 5
, '
ITEM
,NUMBER
DESCRIPTION
CONTRACT
QUANTITIES
CONTRACT: 04-06 CHANGE ORDER #1
INSTALLED
QUANTITIES
NET INCREASE IN
DECREASE COST PER UNIT CONTRACT
PRICE
NET INCREASE TO SECTIONS I, II, III, IV
NET DECREASE TO SECTIONS I, II, III, IV
$72,327.50
($49,404.08)
NET INCREASE TO CONTRACT:
$22,923.42
Page 6
DECREASE IN
CONTRACT PRICE