Loading...
HomeMy WebLinkAbout0111687-Building (fence)OSHKOSH ON THE WATER .lob Address 509 AMHERST AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner KEVIN P/SUSAN GERARDEN Contractor OWNER Category 251 - Fences No 111687 Create Date 11/17/2004 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain No Height Permit # Dwelling Units 0 # Structures Size ~J Projection Canopies Signs Not Required Use/Nature SFR/Replace approx 34 If of 6ft dog earred fence along rear lot line, and extend 6ft dog earred fence for 24 If along the East property line to the of Work lhe SE corner of the property, as per site plan. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $700.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $20.00 Park Dedication $0.00 Date 11/17/2004 Final/O.P. 00/00/0000 Parcel Id # 0702080000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 509 AMHERST AVE Agent/Owner OSHKOSH WI 54901 - 4303 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.