Loading...
HomeMy WebLinkAbout0111762-Building (roof)OSHKOSH ON THE WATER .lob .Address 101 COMMERCE ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner BAYSHORE DEVELOPMENT II LLC Designer Contractor Create Date No 111762 BORSCHE ROOFING PROFESSIONALS LLC Category 223 - Alteration Offices, Banks, Professional Plan 11/23/2004 Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~) Poured Concrete (~) Floating Slab (~) Pier O Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Commercial/Reroof 3 east canopys. Tear off and install rubber membrane roofing. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $3,702.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $38.00 Park Dedication $0.00 Date 11/23/2004 Final/O.P. 00/00/0000 Parcel Id # 0100600101 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2140 W SPENCER ST APPLETON WI 54914 - 0000 Telephone Number 920-733-4064 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.