HomeMy WebLinkAbout0111694-Building (sign)OSHKOSH
ON THE WATER
.lob Address 206-212 W 12TH AVE
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner DALE M/SHERRY L HOTOVEC
Contractor BECK SIGNS
Category 254 - Signs
No 111694
Create Date 11/17/2004
Plan
Type
Building (~ Sign (~ Canopy (~ Fence ~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Poured Concrete
Concrete Block
Not Required
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
~ Floating Slab
~ Post
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Size
~J Projection I
Canopies 0
Signs 0
Use/Nature Office/Remove existing wall sign on east face, install new 16"xl 0' wall sign, install 3x6 wall sign on South Face.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$795.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$20.00 Park Dedication $0.00
Date 11/17/2004 Final/O.P. 00/00/0000
Parcel Id # 0901240000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2269 ALLERTON DR OSHKOSH WI 54904 - 0000 Telephone Number 920-231-1160
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.