Loading...
HomeMy WebLinkAbout0111691-PlumbingOSHKOSH ON THE WATER .lob Address 218-252 WISCONSIN ST Contractor SALM PLUMBING Bathtub 0 Shower 0 Whirlpool 0 Floor Drain 1 Lavatory 4 Lndry Tray 0 Toilet 3 Lndry Stndp 0 Res. Sink 0 Disposal 0 Bar Sink 1 Dishwasher 0 Water Heater 1 Sump Pump 0 Site Drain 3 Classrm Sink 0 Roof Drain 0 Breakrm Sink 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner HIWISCA LLC Category 440- Industrial-Interior Ejector/Grind 0 DipWell 0 F Prep Sink Water Softner 0 Drink Ftn 0 Serv Sink LocaIWaste 0 Wait. St. 0 Shamp Sink CIothesWshr 0 Ice Chest 1 FIr/Wst Sink Bidet 0 Exam Sink 0 Catch Basin Beer Tap 1 SculrySink 0 Wash Ftn Dent. Oper. 0 Hand Sink 1 Urinal Lab Sink 0 Plaster Sink 0 Standp Rec Sterilizer 0 Surgeons Sink 0 Ice Maker No 111691 Create Date 11/16/2004 Plan 0 Gar Drain 1 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 2 EyeWash Statn 0 1 0 1 0 0 0 0 0 Use/Nature REMODLE TENNANT SPACE FOR "ANDROMEDA" BAR of Work Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $10,000.00 Plan Approval $0.00 Permit Fees $147.00 ~ Permit Voided Issued By Parcel Id # 0103150000 Date 11/17/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N1726 BUCHANAN RD KAUKAUNA WI 54130 - 0000 Telephone Number 920-788-7242 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.