Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2004-Building (sign )
OSHKOSH ON THE WATER .lob Address 3265 S WASHBURN ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner BERGSTROM FOXVALLEY INC Contractor RLO SIGN Category 254 - Signs No 111582 Create Date 11/08/2004 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size ~J Projection I Canopies 0 Signs 0 Use/Nature Auto Sales/Reimage Toyota/Scion/Sign-Remove existing sign cabinet, install 8x24 sign body. New directional signs (5x4 and 1.8 sf signs.) of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $42,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $190.00 Park Dedication $0.00 Date 11/11/2004 Final/O.P. 00/00/0000 Parcel Id # 1365010000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1030 ONTARIO AVE SHEBOYGAN WI 53081 - 0000 Telephone Number 920-457-6602 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. Dear Allyn, Page 1 of 1 Dannhoff, Allyn J. From: Bonnie Ehlert [officerlo@charter.net] Sent: Tuesday, November 02, 2004 11:01 To: Allyn Dannhoff Subject: Bergstrom oshkosh 10-26-04 Dear Allyn, The following is the information per your request. Job Site: Bergstrom Toyota 3285 S. Washburn Street Oshkosh WI. 54903 Contractor: RLO Sign, Inc. 1030 Ontario Avenue Sheboygan WI. 53081 Contact: Bormie Ehlert Phone: 920-457-6602 Fax: 920-457-2399 Email: o fficerlo(~,charter.net Si~n~ # I -Re-image Toyota/Scion dual brand pylon. This sign will be retrofitted to the existing pole from the below mentioned removal. The,~ons of this sign will be 24' x 8'. When the re-image is complete the sign will be at 24' OAH. This sign will be/~t- '" 192~a(m~re feet. Removal'oT-~6' x 17'pylon sign. CmTently ~ 25' OAH. This sign ~,.q~are feet. Sign # 6 -Installation of one new double face replacement directional sign. This signs dimensions are 5' x 4'-1". The total square footage is 20.4. Removal of an existing directional sign. The dimensioas of this sign are: 2'-8" x 5'-6". Tile total sqaare footage of this sign is 14.7 S gn # 7-The Bergstrom Import message center pylon square footage is 5~91.t 6 .this sign is at 30' OAH Sign # 5 -The Drive slowly directional sign square footage 1..~.ghis sign is at 5' OAH Missing sign -Honda Pylon isle feet this sign is at 29'- 11" OAH Missing Sign 2 -The Nissan pylon is 100 Square :lbet this sign is at 30'OAH The total square footage o£al1 the grou:nd signs after completion will be~I,204.36 S uare feet 11/8/04 The following is the existing pylon sign, and the proposed pylon sign along with the dimensions of both signs. The following is a picture of the existing directional sign and the proposed directional sign along with the dimensions of both signs. Page 1 of 1 600' 31' Washburn SL 'W http://pics.cnsaigncs.com/TOYOTA_US/48051/kpO 101 .gif 8/18/2004 Parking Spaces New Vehicles UNITS = 54 Used Vehicles UNITS = 27 Customer Vehictes UNITS = 17 Employee Vehicles UNITS = 16 TOTAL PARKING SPACES = 1 t4 TOTAL LAND = 362,769 ADDITIONAL ON SITE PARKING SPACES = 363. 1. Provide PL= Property Line 2. # of Parking Spaces and Breakdown 3. Draw 1 continuous PLine around Toyota Building (same for other buildings - if applicable) 4. Show all Curb cuts, Existing or New site conditions / elements 5. Indicate Main Entry 6. All Parking Spaces 9'x 20' (TYP.) 7. All Drive Aisles 25'-0" minimum (TYP) 8. Delivery Access (55' minimum turning radius) 9. Provide Nodh Arrow & Scale 10. Use TMS Provided legend 11. Body Shop legend provided (if applicable) [I 19 USED 50 NEW INVINTORY J -~W coo W w HONDA FACILITY MAIN ENTRANCE (5) STALLS (NEW) CUSTOMER PARKING USED 6 CUSTOMER 600.0(0' EXIS~NG DE~NTIOhq AREA 8 NEW 16 NEW ¢~_~. ~ ,I ,, 1 , ,, i ~ iiiiii i ii ill [ ~ ~ ii i i i1[ ~ ~ I i ~ I I BER:OSTROM NISSAN FA~CI L1 TY EXISTING SALES/SERVICE ENTRANCE/EXIT DE~NTiON AREA SOUTH W,ASHEIURN 11 I I EXIS~NG DETENTION AREA L1) IST~LL4 EXISq BERGSTROM USED CAR FACILITY Il_Z>,. (22 USE tS' D 11' EXISTING DETENTION AREA ,% DITCH FLOW ' I I STREET ''T-I ..... =~===:t= EXISTING\ SALES/SERVICE ENTRANcE/EXIT SITE P LAN © Copyright. This Print/Computer File '~ Is The Exclusive Property Of Gries Architectural Group, Inc. Use 0nly For Purpose Which Loaned. Copying Or Is Prohibited. Return Upon Request. I 7 7 date' job: 04-057 d. by: ~.~ rev.: O.1