HomeMy WebLinkAbout0109682-Plumbing (water heater)OSHKOSH
ON THE WATER
,Job Address 1813 ASHLAND ST
Contractor KURT ZENTNER & SONS INC
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp __
Res, Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner WILLIAM M SHEW
Category 411 - Residential-Water Heaters
0 Ejector/Grind 0 Dip Well 0 F Prep Sink __
0 Water Softner 0 Drink Ftn 0 Serv Sink
0 LocaIWaste 0 Wait. St. 0 Shamp Sink __
0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink __
0 Bidet 0 Exam Sink 0 Catch Basin __
0 Beer Tap 0 SculrySink 0 Wash Ftn
0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Lab Sink 0 Plaster Sink 0 Standp Rec __
0 Sterilizer 0 Surgeons Sink 0 Ica Maker
No 109682
Create Date 07/30/2004
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Iht Grease Trap 0
0 Ext Grease Trap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Nature
of Work
INSTALL NG WTR HTR
Valuation
Issued By
Sani~rySewer
Storm Sewer
Water Service
Size Material Type
# Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$500.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Parcel Id #
1503380000
Date 07/30/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Address 2860 OREGON ST
Agent/Owner
OSHKOSH WI 54902 - 0000 Telephone Number 235-1340
TO schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.