Loading...
HomeMy WebLinkAbout0109682-Plumbing (water heater)OSHKOSH ON THE WATER ,Job Address 1813 ASHLAND ST Contractor KURT ZENTNER & SONS INC Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp __ Res, Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner WILLIAM M SHEW Category 411 - Residential-Water Heaters 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 LocaIWaste 0 Wait. St. 0 Shamp Sink __ 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink __ 0 Bidet 0 Exam Sink 0 Catch Basin __ 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ 0 Sterilizer 0 Surgeons Sink 0 Ica Maker No 109682 Create Date 07/30/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work INSTALL NG WTR HTR Valuation Issued By Sani~rySewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $500.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided Parcel Id # 1503380000 Date 07/30/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2860 OREGON ST Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 235-1340 TO schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.