HomeMy WebLinkAbout0108466-Plumbing (toilet)OSHKOSH
ON THE WATER
,Job Address 663 N MAIN ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner NATHAN M HENNAGER
Contractor M P KELLY
Category 440- ]ndustrialqntedor
No
Create Date
Plan
108466
06/03/2004
Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
Toilet 1 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Iht Grease Trap
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZ Valve
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
REPLACED TOILET BOWL FOR "BARLEY & HOPS"
Sanitary Sewer
Storm Sewer
Water Service
Size
Material Type #
Conn. Type
0
0
0
0
0
0
0
Valuation $177.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit Voided
Issued By
Parcel Id #
0700810000
Date 06/03/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.