Loading...
HomeMy WebLinkAbout0108467-Plumbing (sump pump)OSHKOSH ON THE WATER Job Address 1580 MARICOPA DR Contractor M P KELLY CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner CRAIG M FORBES Category 410- Residential-interior Bathtub 0 Shower 0 Ejector/Grind 0 DipWell Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest Res. Sink 0 Disposal 0 Bidet 0 Exam Sink Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink Water Heater 0 Sump Pump 1 Dent. Oper. 0 Hand Sink Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink No 108467 Create Date 06/03/2004 Plan 0 F Prep Sink 0 Gar Drain 0 0 ServSink 0 Soda Disp 0 0 Shamp Sink 0 Coffee Maker 0 0 FIr/Wst Sink 0 Iht Grease Trap 0 0 Catch Basin 0 Ext Grease Trap 0 0 Wash Ftn 0 RPZValve 0 0 Urinal 0 Eye Wash Statn 0 0 Standp Rec 0 0 Ice Maker 0 Use/Nature of Work REPLACED SUMP PUMP Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $218.00 Plan Approval $0.00 Permit Fees Issued By Corm. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] PermitVoidedI Parcel Id # 1319900000 Date 06/03/2004 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starfing such activity. Signature Date Agent~Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231~1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.