HomeMy WebLinkAbout0108467-Plumbing (sump pump)OSHKOSH
ON THE WATER
Job Address 1580 MARICOPA DR
Contractor M P KELLY
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CRAIG M FORBES
Category 410- Residential-interior
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St.
Toilet 0 LndryStndp 0 Clothes Wshr 0 Ice Chest
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink
Water Heater 0 Sump Pump 1 Dent. Oper. 0 Hand Sink
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink
No 108467
Create Date 06/03/2004
Plan
0 F Prep Sink 0 Gar Drain 0
0 ServSink 0 Soda Disp 0
0 Shamp Sink 0 Coffee Maker 0
0 FIr/Wst Sink 0 Iht Grease Trap 0
0 Catch Basin 0 Ext Grease Trap 0
0 Wash Ftn 0 RPZValve 0
0 Urinal 0 Eye Wash Statn 0
0 Standp Rec 0
0 Ice Maker 0
Use/Nature
of Work
REPLACED SUMP PUMP
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Valuation $218.00 Plan Approval $0.00 Permit Fees
Issued By
Corm. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] PermitVoidedI
Parcel Id #
1319900000
Date 06/03/2004
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starfing such activity.
Signature Date
Agent~Owner
Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231~1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.