Loading...
HomeMy WebLinkAbout0108470-Plumbing (toilet)OSHKOSH ON THE WATER Job Address 931 JEFFERSON ST Contractor M P KELLY CITY OF OSHKOSH No 108470 PLUMBING PERMIT - APPLICATION AND RECORD Owner WILLIAM E KLISS Create Date 06/03/2004 Category 410 - Residential-interior Plan Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain Whirtpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker Toilet I LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 0 0 0 0 0 0 0 Use/Nature of Work REPLACED TOILET Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $226.00 Plan Approval $0.00 Permit Fees $20.00 [] Permit VoidedJ Issued By Parcelld # 1001160000 Date 06/03/2004 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applicetion within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenFOwner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.