Loading...
HomeMy WebLinkAbout0108657 POSHKOSH ON THE WATER Job Address 219 W NEW YORK AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH No 108657 PLUMBING PERMIT - APPLICATION AND RECORD Owner HARVEY K HARTMAN Create Date 06/03/2004 Category 411 - Residential-Water Heatem Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Claearm Sink Roof Drain 0 Breakrm Sink 0 Ejector/Grind 0 Dip Well 0 F PrepSink 0 Gar Drain 0 WaterSoftner 0 DrinkFtn 0 ServSink 0 Soda Disp 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work INSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $450.00 Plan Approval $0.00 Perfnit Fees $20.00 [] Permit Voided Issued By Parcel Id # 1008040000 Date 06/11/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described censtm¢ion. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and [o secure any necessary approvals before starting such activity. Signature Date Address 522 W. MURDOCKAVE Agent/Owner OSHKOSH WI 54901 ~ 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.