HomeMy WebLinkAbout0108657 POSHKOSH
ON THE WATER
Job Address 219 W NEW YORK AVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH No 108657
PLUMBING PERMIT - APPLICATION AND RECORD
Owner HARVEY K HARTMAN Create Date 06/03/2004
Category 411 - Residential-Water Heatem Plan
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 1 Sump Pump
Site Drain 0 Claearm Sink
Roof Drain 0 Breakrm Sink
0 Ejector/Grind 0 Dip Well 0 F PrepSink 0 Gar Drain
0 WaterSoftner 0 DrinkFtn 0 ServSink 0 Soda Disp
0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker
0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve
0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
INSTALL NG WTR HTR
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $450.00 Plan Approval $0.00 Perfnit Fees $20.00 [] Permit Voided
Issued By
Parcel Id #
1008040000
Date 06/11/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described censtm¢ion.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and [o secure any necessary approvals before starting such activity.
Signature Date
Address 522 W. MURDOCKAVE
Agent/Owner
OSHKOSH WI 54901 ~ 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.