Loading...
HomeMy WebLinkAbout0108656-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 613 W NEW YORK AVE Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner GRACE M LAVOY Category 411 - Residential-Water Heaters 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 WaterSoftner 0 Drink Ftn 0 ServSink 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Bidet 0 Exam Sink 0 Catch Basin 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No Create Date Plan 108656 06/03/2004 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap __ 0 F. xt Grease Trap __ 0 RPZ Valve 0 Eye Wash Statn 0 0 0 0 0 0 0 0 0 Use/Nature of Work INSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Valuation $450.00 Plan Approval $0.00 Permit Fees Issued By Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided J Parcelld # 0501850000 Date 06/11/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity, Signature Date AgentJOwner Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.