Loading...
HomeMy WebLinkAbout0108643 POSHKOSH ON THE WATER ,Job Address 1413 LAWNDALE ST Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner MARK NMARY B PETERSON Category 411 - Residential-Water Heaters Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/~Vst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 108643 Create Date 06/03/2004 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 lnt Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work INSTALL NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type # Valuation $450.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided Parcel Id # 1513960000 Date 06/11/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applicetion within an easement, the City strongly urges the permit appiicent to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.