Loading...
HomeMy WebLinkAbout0108969-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 2505 SHERIDAN ST Contractor M P KELLY CITY OF OSHKOSH No 108969 PLUMBING PERMIT - APPLICATION AND RECORD Owner GERALD G/MARIE GUMZ Create Date 06/28/2004 Category 411 - Residential-Water Heaters Plan Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 LndryStndp __ Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater 1 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Water Softner 0 Drink Ftn 0 ServSink 0 Soda Disp 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap __ 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap __ 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye WashStatn 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work REPLACED NGWTR HTR Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $656.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoidedI Issued By Parcelld # 1227460000 Date 06/28/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before staking such activity. Signature Date Agent/Owner Address 665 N MAiN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.