Loading...
HomeMy WebLinkAbout0108967-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 1076 W 10TH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JAMES M CHRISTOPHER Contractor M P KELLY Category 411 - Residential-Water Heaters Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Sar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No Create Date Plan 108967 06/25/2004 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Iht GreaseTrap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 0 Use/Nature of Work REPLACED NG WTR HTR Sanitary Sewer Storm Sewer Water Service Size Mater/a[ Type # Conn. Type 0 0 0 0 0 0 0 Valuation $936.00 Plan Approval $0.00 PermitFees $20.00 [] PermitVoidedI Issued By Parcelld # 1307580100 Date 06/28/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicadt to contact the easement holder(s) and to secure any necessary approvals before starling such activity. Signature Date Agent/Owner Address 665 N MAIN ST OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.