NOVEMBER 9, 2004
04-402
RESOLUTION
(CARRIED 7 -0 LOST
LAID OVER
WITHDRAWN
PURPOSE:
ACCEPT AND APPROVE AMENDED WAIVER OF SPECIAL
ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH
IMPROVEMENTS - STONEY BEACH WEST SUBDIVISION
INITIATED BY:
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the Amended
Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the
Wisconsin Statutes, for public improvements and services, for the premises described in the
attached Waiver is accepted and approved.
WANER OF SPECIAL ASSESS:MENT NOTICES AND
HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES
The undersigned, owner of property benefited by the following improvements to be made by the
City of Oshkosh, Winnebago County, State of Wisconsin, to wit:
For public construction; surveying and inspection of sidewalk and concrete paving and for the
design of the concrete paving.
For Private construction and public surveying and inspection for sanitary sewer, storm sewer,
water main, laterals, grading and graveling.
In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I
héreby admit that such public improvement will benefit said property and consent to the levying
of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for
the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I
hereby waive all special assessment notices and hearings required by Section 66.0703 of the
Wisconsin Statutes; and I further agree and admit that the benefit of my property ITom the
construction of such improvements is in proportion to the footage thereof:
Description of Premises
Stoney Beach West Subdivision
Lots 1-22 and 1 Outlot (Lot 2, Lot 17 and Outlot 1 are not assessable)
Gibson Court (Includes stub road at approximately station 17+00)
1. Sanitary Sewer (Private Construction)
Estimated Construction Cost $67,806 Private
6% Survey and Inspection $ 4,068 Invoice
2. Water Main (private Construction)
Estimated Construction Cost $89,476 Private
6% Survey and Inspection $ 5,369 Invoice
3. Sanitary and Water Laterals (Private Construction)
Estimated Construction Cost $23,070 Private
6% Survey and Inspection $ 1,384 Invoice
4. Storm Sewer Laterals (private Construction)
Estimated Construction Cost $13,620 Private
6% Survey and Inspection $ 817 Invoice
5.
Storm Sewer (private Construction) .
Estimated Construction Cost $73,977 Private
6% Survey and Inspection $ 4,439 Invoice
Page 2
Stoney Beach West Subdivision
6. Sidewalk (Public Construction) ASSESS
Assessment Rate = $20.00 per ITont foot of each lot
Includes 6% for inspection and surveying.
Lot # Front Feet Sidewalk Cost Estimate
1 292.28 $5,845.60
2 No Sidewalk
3 80.24 $1,604.80
4 65.46 $1,309.20
5 177.82 $3,556.40
6 152.22 $3,044.40
7 40.78 $ 815.60
8 47.41 $ 948.20
9 59.46 $1,189.20
10 60.00 $1,200.00
11 59.24 $1,184.80
12 50.68 $1,013.60
13 44.64 ~ $ 892.80
14 50.07 $1,001.40
15 54.30 $1,086.00
16 50.22 $1,004.40
17 No Sidewalk
18 176.27 $3,525.40
19 184.96 $3,699.20
20 80.74 $1,614.80
21 228.09 $4,561.80
22 290.75 $5,815.00
Outlot 1 No Sidewalk
TOTAL 2245.63 $44,912.60
7. Grading and Graveling (private Construction)
Center Line Feet of Roadway = 1525/Lf.
Cost per Center Line Foot = $36/Lf
Estimated Construction Cost
6% Survey and Inspection
Page 3
$54,900.00
$ 3,294.00 (Invoice)
Stoney Beach West Subdivision
8. Concrete Paving (Public Construction - Year 2007) ASSESS
Center Line Feet of Roadway = 1525 Lf.
Cost per Center Line Foot = $125.00I1f
Include six (6) Handicapped Ramps 6 x $600.00 = $3,600.00
Estimated City/Assessable portion of the Gibson Court concrete paving. (2782 Fond du Lac Road &
2816 Fond du Lac Road):
2782 Fond du Lac Road
560.69 ft. (total frontage on Gibson Court) - 75 ft. (reduction per City of Oshkosh Assessment
Policy) = 485.69 ft.
485.69ft x $32.60I1f= $15,833.49 + $1,900.32 (12% Survey, Inspection & Design) = $17,733.81
2816 Fond du Lac Road
169.76ft - 75 ft. (reduction per City of Oshkosh Assessment Policy) = 94.76lf.
94.761fx $32.60I1f= $3,089.18 + $370.71 (12% Survey, Inspection & Design) = $3,459.89
Total Estimated Paving Construction Cost: (15251fx $ 12511f) + $3,600.00 = $194,225.00
Sub-Total
$ 11,654.00
$ 11,654.00
$217,533.00
6% Survey and Inspection
6% Design
Less Estimated Assessable Portion for 2782 Fond du Lac Road
Less Estimated Assessable Portion for 2816 Fond du Lac Road
-$
-$
$ 17,733.81
$ 3,459.89
Total
$ 196,339.30
Lots 1-22, not to include Lot 2, Lot 17 and Outlot 1($196,339.30/20 lots) = $9,816.97/lot ASSESS
3 - Year Letter of Credit for Private Construction = $322,849.00
3 - Year Letter of Credit for Public Services = $19,371.00 .
2 - Year Letter of Credit Guarantee After Acceptance of Private Construction= $64,570.00
Note: Per Common Council action (City Resolution #04-168) special assessments for grading, graveling
and utilities were deferred without interest for 2782 Fond du Lac Road in the amount of $16,725.24, to be
paid by the Developer of Stoney Beach West Subdivision .as part of the Developers Agreement for that
subdivision and to be reimbursed to the Developer or his/her successor at the time of subdivision of 2782
Fond du Lac Road.
Signature of Owner:
Date
Date
by: Robert C. Anderson
Stoney Beach West, LLC
by: Kathleen M. Lennon
Stoney Beach West, LLC