HomeMy WebLinkAbout0111547-Building (garage) - � CITY OF OSHKOSH ,,:,NED No 111547
��
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECOFtD�a�ti� �•
ON THE WATER
Job Address 1513 FOX ST Owner PAUL R ZUTZ Create Date 11/08/2004
Designer Contractor OWNER
Category 150-New Accessory Buildings-Garages(Residential) Plan
Type � Building � Sign 0 Canopy � Fence � Raze
Zoning Class of Const: VB Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I,
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 800 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab 0 Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Required Flood Plain Yes Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature �SFR/Construct new 25'x 32'detached garage-to be elevated above flood elevation as per plans submitted. Driveway is required to be
of Work paved within 18 months,and will require and additional permit.
i
,
HVAC Contractor Plumbing Contractor
Efectric Contractor
Fees: Valuation 0.00 Plan Approvai $0.00 Permit Fee Paid $74.00 Park Dedication $0.00
Issued By: Date 11/08/2004 Final/O.P. 00/00/0000
� Permit Voided I Parcel Id# 1600800000
In the performance of this work I agree to perForm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to se¢�e any n ssary approvals before starting such activity.
Signature Date f -
Agent/Owner
Address 1513 FOX ST OSHKOSH WI 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.