Loading...
HomeMy WebLinkAbout0111456-Plumbing (remodel)OSHKOSH ON THE WATER .lob Address 708 W MURDOCKAVE Contractor SOPER PLUMBING Bathtub 0 Shower 0 Whirlpool 0 Floor Drain 0 Lavatory 0 Lndry Tray 0 Toilet 0 Lndry Stndp 0 Res. Sink 0 Disposal 0 Bar Sink 0 Dishwasher 0 Water Heater 0 Sump Pump 0 Site Drain 0 Classrm Sink 0 Roof Drain 0 Breakrm Sink 0 CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JAMES H LANG PROPERTIES INC Category 440- Industrial-Interior Ejector/Grind 0 DipWell 0 F Prep Sink Water Softner 0 Drink Ftn 0 Serv Sink LocaIWaste 0 Wait. St. 0 Shamp Sink CIothesWshr 0 Ice Chest 0 FIr/Wst Sink Bidet 0 Exam Sink 0 Catch Basin Beer Tap 0 SculrySink 1 Wash Ftn Dent. Oper. 0 Hand Sink 1 Urinal Lab Sink 0 Plaster Sink 0 Standp Rec Sterilizer 0 Surgeons Sink 0 Ice Maker No 111456 Create Date 11/02/2004 Plan 1 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 EyeWash Statn 0 0 0 0 0 0 0 0 0 Use/Nature REMODLE UNIT"700" FOR NICKLES PIZZA of Work Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 0 Valuation $4,000.00 Plan Approval $0.00 Permit Fees $21.00 ~ Permit Voided Issued By Parcel Id # 1218840000 Date 11/02/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2225 BURNWOOD DR OSHKOSH WI 54902 - 0000 Telephone Number 426-2151 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.