Loading...
HomeMy WebLinkAbout0111546-PlumbingOSHKOSH ON THE WATER .lob Address 2195 STATE ROAD 21 Contractor D.R. HANSEN PLBG. CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner POMMERENING DEVELOP CORP Category 440- Industrial-Interior No 111546 Create Date 11/08/2004 Plan Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 1 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 2 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 2 Lndry Stndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 1 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature car dealership facility of Work Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 1-1/4" Plastic Lateral 1 New 0 0 0 0 Valuation $9,000.00 Plan Approval $0.00 Permit Fees $99.00 ~ Permit Voided Issued By Parcel Id # 1621500100 Date 11/08/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 - 0000 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.