Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item VII.A
PLAN COMMISSION STAFF REPORT APRIL 15, 2024 ITEM VII A: PUBLIC HEARING: CONDITIONAL USE PERMIT REQUEST FOR TRANSIT CENTER EXPANSION AT 110 PEARL AVENUE, 222 PEARL AVENUE, AND PROPERTY LOCATED ON THE SOUTH SIDE OF THE 100 BLOCK OF HIGH AVENUE (PARCEL 0101160000) GENERAL INFORMATION Applicant: Jon Wallenkamp - Kueny Architects Owner: City of Oshkosh – GO Transit Action(s) Requested: The applicant is requesting a Conditional Use Permit for expansion of the existing GO Transit station. Applicable Ordinance Provisions: Transit center land uses are permitted only through a Conditional Use Permit (CUP) in the Central Mixed Use district (CMU) as regulated in Section 30-54 (C) of the Zoning Ordinance. Criteria used for CUPs are located in Section 30-382 of the Zoning Ordinance. Property Location and Background Information: The subject area includes three parcels totaling 1.79 acres, with frontage on High Avenue, Pearl Avenue, and Market Street. The property located at 110 Pearl Avenue includes the existing GO Transit station and associated parking area, while the vacant property to the west, included with this request, has access drives and parking stalls already in use by the GO Transit station. The property located at 222 Pearl Avenue includes an existing office building which will be demolished as part of the project. Subject Site Existing Land Use Zoning Transit Center & Office I & CMU Adjacent Land Use and Zoning Existing Uses Zoning North Commercial CMU & I South Commercial CMU-PD-RFO East Mixed Use & Commercial CMU West Commercial CMU Recognized Neighborhood Organizations Downtown Page 1 Item VII.A – CUP: Transit Center Comprehensive Plan Comprehensive Plan Land Use Recommendation Land Use 2040 Land Use Recommendation Center City ANALYSIS Use The site has a bus platform, bus driver support building, and a newly acquired office building (222 Pearl Avenue). GO Transit is proposing to demolish the existing office building and construct a new 1,515 sq. ft. restroom/waiting area building (“New Support Building”) and bus platform to the west of the new building. GO Transit has requested a rezone at 110 Pearl Avenue and the vacant property located to the west of 110 Pearl Avenue (previous Item VI), to provide consistent CMU zoning for the three subject properties. A Certified Survey Map (CSM) will be used to combine the three parcels into one. Site Design & Access As proposed, the site will have access to the new and existing bus platforms from Market Street, Pearl Avenue, and High Avenue. The existing public parking lot will have access from High Avenue. Page 2 Item VII.A – CUP: Transit Center Required Provided Front Setback (Market St.) 0 ft. 0 ft. Street Side Setback (High Ave.) 0 ft. 6.5 ft. +/- Street Side Setback (Pearl Ave.) 0 ft. 0 ft. Side Setback (northeast) 0 ft. building 5 ft. pavement 0 ft. (existing pavement) Rear Setback (west) 0 ft. building 5 ft. pavement 8 ft. +/- Required Provided Parking Spaces Min: 0 53; including public lot Impervious Surface Max: 100% of lot 80% of lot +/- The new restroom/waiting area building will be built to the northwest of the existing driver support building and the new platform will be west of the new building. The proposed new buildings meet setback requirements for the CMU District and the additional pavement will not extend into established setback areas. The public lot will have 53 parking spaces. There is no minimum parking requirement or maximum impervious surface ratio for the CMU District. Signage No sign plans were included with this request. Lighting A lighting plan was not included with this request. Any changes to the existing lighting will be reviewed for compliance. Storm Water Management The applicant has been in contact with the Department of Public Works regarding storm water management for the subject area. The final storm water management plans will be approved during the Site Plan Review process. Landscaping The applicant has stated that existing plantings on the site will be preserved, or replaced. The final landscape plan will be reviewed during the Site Plan Review process. Building Facades The proposed CMU zoning of the site will require a Special Area Design Review of the new restroom/waiting area building and bus platform. Special Area Design Review will be addressed under subsequent agenda Item VII.B. Page 3 Item VII.A – CUP: Transit Center RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council, on an application for a CUP, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-382 (F)(3): (1) Is in harmony with the Comprehensive Plan as the Center City future land use classification recommends public land uses. (2) Would not result in a substantial or undue adverse impact on nearby property, the character of the neighborhood, environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other matters affecting the public health, safety, or general welfare because the proposed site will comply with zoning requirements for the CMU District. (3) Maintains the desired consistency of land uses, land use intensities, and land use impacts as related to the environs of the subject property because the transit center use is consistent with the existing use of the property and compatible with neighboring commercial uses. (4) The conditional use is located in an area that will be adequately served by, and will not impose an undue burden on, any of the improvements, facilities, utilities or services provided by public or private agencies serving the subject property as existing infrastructure is in place to expand the transit center use. (5) The potential public benefits outweigh any potential adverse impacts of the proposed conditional use, after taking into consideration the applicant’s proposal and any requirements recommended by the applicant to ameliorate such impacts because the transit center expansion will improve public transportation for the City. Staff recommends approval of the proposed CUP for a transit center use at 110 Pearl Avenue, 222 Pearl Avenue, and the property located on the south side of the 100 block of High Avenue (parcel 0101160000) as proposed with the findings listed above and the following condition: (1) Final landscaping and lighting plans shall be approved by the Department of Community Development. Page 4 Page 5 Page 6 Page 7 April 3, 2025 Oshkosh Go Transit Expansion - Phase 2 110 Pearl Avenue, Oshkosh, WI 54901 Re: Narrative of the proposed request The project is the Phase 2 to a project that was completed in 2023. The Phase 1 of the project was the construction of a driver support facility at the Pearl Street site. Phase 2 is the construction of a public restroom facility and waiting area north of the Phase 1 construction. The Phase 2 facility will have matching materials to the Phase 1 driver support facility; red brick facade with beige metal siding. The new facility will also feature stone cladding at the primary public entrance to help as a visual way-finding marker. The Phase 2 project will also include a second bus platform area. The new platform area will replicate the existing platform area, with matching dark bronze metal roof and red face brick columns. The site landscaping will be primarily grass. Existing plantings along the north edge of the property will be preserved, or replaced if needed. All plantings on the property will be well maintained. Please let me know if you have any comments/questions. Sincerely, Jon Wallenkamp, AIA KUENY ARCHITECTS LLC. Page 8 (FOR Ø60 POLES)461.416[461.42] 349.96[350.0] 349.8 60 ∅76 (FOR Ø60 POLES) 461.416[461.42] 349.96[350.0] 349.8 60∅76 (FOR Ø60 POLES)461.416[461.42] 349.96[350.0] 349.8 60 ∅76 PROPOSED BUILDING 1,515 SQ/FT EXISTING DRIVER SUPPORT BUILDING EXISTING BUS PLATFORM NEW BUS PLATFORM PHASE 1 CONSTRUCTION (ALREADY COMPLETED) 4 0'-0" 4 0'-0" 12'-0" 17'-4" 17'-8" 25'-4" 24'-0" 28'-4" 26'-2" 22'-0" 12'-0" 40'-0" 9'-6" 9'-6" NEW SIDEWALK CURB BOTH SIDES OF WALK ROLLED CURB FOR SNOW MOVEMENT SNOW STORAGE HIG H AVENUE B R O W N S T R E E T PEARL AVENUE M A R K E T S T R E E T 53 PARKING STALLS NEW SUPPORT BUILDING EXISTING PLANTINGS TO REMAIN (OR BE REPLACED WITH SIMILAR KIND) EXISTING PLANTINGS TO REMAIN (OR BE REPLACED WITH SIMILAR KIND) B1 B2 B3 B4 B5 B6 9'-0"28'-0"28'-0"28'-0"28'-0"28'-0"9'-0" FACE BRICK COLUMN WRAP MATCH EXISTING BUS CANOPY PREFINISHED DARK BRONZE GUTTERS AND DOWNSPOUTS MATCH EXISTING BUS CANOPY DARK BRONZE STANDING SEAM METAL ROOF. MATCH EXISTING BUS CANOPY STAINLESS STEEL COLUMN WRAP PROTECTION PLATE WOODEN SLAT BENCH PAINTED BROWN W/ STAINLESS STEEL LEG WRAPS12 ' - 0 " 8" kuenyarch.com ©2025 Kueny Architects L.L.C. -All Rights Reserved PLAN NORTH TRUE NORTH SCALE: As indicated A101City of Oshkosh - GO Transit - New Public Support Building and Bus Platform April 3, 2025 Master Facility Site Plan 110 Pearl Avenue, Oshkosh, WI 54901 1" = 30'-0"1 Site - Master Plan 1/8" = 1'-0"2 New Bus Canopy - West Elevation Page 9 kuenyarch.com ©2025 Kueny Architects L.L.C. -All Rights Reserved KEYNOTE LEGEND SCALE: R 02City of Oshkosh - GO Transit - New Public Support Building and Bus Platform February 17, 2025 View #2 110 Pearl Avenue, Oshkosh, WI 54901 Page 10 ZONE CHANGE, CUP, & BLDG REVIEW TRANSIT CENTER PC: 4-15-2025 CITY CENTER ASSOCIATES LLC C/O JEFF PAULY 334 CITY CTR OSHKOSH WI 54901-4826 BAYSHORE DEV II LLC PO BOX 3435 OSHKOSH WI 54903-3435 BL BRANCH GROUP II LLC 120 E WASHINGTON ST STE 201 SYRACUSE NY 13202-4008 BROWN BELL PROPERTIES LLC 103 HIGH AVE OSHKOSH WI 54901-4808 101 HIGH AVE LLC ATTN: JILL A ANDERSON 1229 MERRITT AVE OSHKOSH WI 54901-5347 KINGS LAUNDRY INC C/O GUNDERSON CLEANERS 41 MAIN ST MENASHA WI 54952-3198 MAX P/KARIN L HERMANS 1352 SHERRIN ST OSHKOSH WI 54904-8415 WILLIAM R MANSKE 927 BROOKWOOD CT OSHKOSH WI 54902-3317 NORTHERN TELEPHONE & DATA CORP PO BOX 3465 OSHKOSH WI 54903-3465 OSHKOSH LUXURY LOFTS LLC 2270 NORTH HAVEN LN OSHKOSH WI 54904-9337 WILKINS 145 LLC 2340 GENEVA ST OSHKOSH WI 54901-1804 WR RIDGE HOLDINGS LLC PO BOX 346 WRIGHTSTOWN WI 54180-0346 GILLENS LLC C/O PAUL T WINTER 5042 WASHINGTON ST BUTTE DES MORTS WI 54927-9326 OSH COMM CREDIT UNION 250 PEARL AVE OSHKOSH WI 54901-4834 DOWNTOWN NBHD ASSOC EMAILED TO REP Page 11 CITY CENTER C O M MERCE ST DIVISION ST PEARL AV BROWN ST MARKETST N MAIN ST ALGOMA BLVD HIGH AV OperahouseSquare J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 3/12/2025 1 in = 120 ft1 in = 0.02 mi¯BASE MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 12 OTTER AV BROAD ST NEBRASKA ST MINNESOTA ST DAWES ST COMMERCE ST W PARKWAY AV MERRITT AV DIVISION ST GRAND ST CENTRAL ST MT VERNON ST FREDERICK ST E PARKWAY AV NORTHWESTERN AV HUDSON AV PEARL AV COURT ST CITY CENTER PEARL AV WAUGOO AV CHURCHAV BROAD ST DAWES ST W 5TH AV E 7TH AV IDA AV CHURCH AV MARKETST RIVERWAY DR DIVISION ST BROWN ST MARKETST JEFFERSON ST CAMPUS PL W 7TH AV W 6TH AV W 8TH AV W 7TH AV W 6TH AV PLEASANT ST MADISON ST OXFORD AV MARIONRD DIVISION ST DIVISION ST FRANKLIN ST BROAD ST STATE ST CENTRAL STWISCONSIN ST S MAIN ST N MAIN ST OREGON ST CEAPE AV JACKSON ST HIGH AV ALGOMA BLVD WASHINGTON AV CMU CMU CMU CMU CMU CMU-PD CMU-PD CMU-PD CMU-PD CMU-PD-RFO CMU-RFO I I I I I I I I-PD I-PD I-PD I-PD I-PD I-PD I-PD I-PD I-PD-RFO I-PD-UTO I-UTO MR-36 MR-36-UTO RMU-PDRMU-PD RMU-PD RMU-PD RMU-PD-RFO RMU-PD-RFO RMU-RFOTR-10 TR-10 TR-10 TR-10 TR-10-PD TR-10-PD UMU UMU UMU UMU UMU UMU UMU UMU UMU UMU-PD UMU-PD UMU-PD UMU-PDUMU-PD UMU-PD-UTO UMU-RFO UMU-UTO UMU-UTO J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 3/12/2025 1 in = 500 ft1 in = 0.09 mi¯ZONING MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 13 DIVISION ST PEARLAV CITY CENTER MARKETST BROWN ST COMMERCE ST HIGH AV ALGOMA BLVD J:\GIS\Planning\Plan Commission Site Plan Map Template\2023 Plan Commission Site Plan Map Template.mxd User: katrinam Prepared by: City of Oshkosh, WI Printing Date: 3/12/2025 1 in = 100 ft1 in = 0.02 mi¯AERIAL MAP City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 14