Loading...
HomeMy WebLinkAbout23-29 CO #1 (Final)_12-10-24TO: VINTON CONSTRUCTION CO. CHANGE ORDER #1 (FINAL) P.O. BOX 1987 MANITOWOC, WI 54221 Your present contract with the City of Oshkosh, Contract No. 23-29, awarded January 9, 2024, is hereby amended and changed as follows: ($560.89) ($20,905.76) ($9,490.00) ($34,719.91) $38,929.03 NET DECREASE TO CONTRACT ($26,747.53) SECTION I TOTALS BID TOTAL $367,065.74 $367,065.74 CO #1 ($26,747.53)($26,747.53) CONTRACT TOTAL $340,318.21 $340,318.21 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney NET DECREASE TO WORK UNIT A: NET DECREASE TO WORK UNIT B: NET DECREASE TO WORK UNIT C: NET INCREASE TO ADDITIONAL WORK: DATE: DECEMBER 10, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ NET DECREASE TO WORK UNIT D: Docusign Envelope ID: AAAAF0CF-F933-431D-8EC7-D875F5F27F6D CONTRACT 23-29 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $8,500.00 A1100 Removing pavement; complete as specified Square Yards 1559.00 1,559.00 $4.90 A1150 Building demolition; complete as specified Lump Sum 1.00 1.00 $9,500.00 A1160 Utility service removal; complete as specified Lump Sum 1.00 1.00 $8,400.00 A1170 Light pole removal; complete as specified Each 4.00 2.00 -2.00 $100.00 ($200.00) A1700 Sawing existing pavement; complete as specified Linear Feet 67.00 64.60 -2.40 $4.00 ($9.60) A1904 Remove and replace HMA pavement; including sawing; fine grading; turf restoration; and traffic control; complete as specified Square Yards 39.00 15.40 -23.60 $140.00 ($3,304.00) A2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 1.00 1.00 $150.00 A2510 Sediment removal - Type D modified inlet protection; complete as specified Each 1.00 0.00 -1.00 $50.00 ($50.00) A2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 1.00 0.00 -1.00 $0.01 ($0.01) A2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 500.00 500.40 0.40 $3.00 $1.20 A2600 Furnish and install topsoil 6" depth; complete as specified Square Yards 1559.00 3,121.60 1562.60 $3.50 $5,469.10 A2602 Install salvaged topsoil 6" depth; complete as specified Square Yards 1258.00 0.00 -1,258.00 $1.75 ($2,201.50) A2622 Furnish and install no-mow fescue; complete as specified Square Yards 2817.00 3,121.60 304.60 $1.11 $338.11 A2644 Furnish and install hydraulically-applied erosion control product; complete as specified Square Yards 2817.00 3,121.60 304.60 $0.52 $158.39 A2902 Strip and stockpile topsoil; complete as specified Square Yards 1258.00 0.00 -1,258.00 $0.01 ($12.58) A2932 Import clay material; complete as specified Cubic Yards 500.00 450.00 -50.00 $15.00 ($750.00) A2937 Furnish and install clay dams; complete as specified Each 3.00 3.00 $850.00 WORK UNIT A (BID ITEMS A1050 - A2937 - SUBTOTAL: $5,966.80 ($6,527.69) WORK UNIT A Page 2 of 5 Docusign Envelope ID: AAAAF0CF-F933-431D-8EC7-D875F5F27F6D CONTRACT 23-29 CHANGE ORDER #1 (FINAL) NET DECREASE TO UNIT A: ($560.89) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE B1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $16,000.00 B1100 Removing pavement; complete as specified Square Yards 1,258.00 817.30 -440.70 $4.90 ($2,159.43) B1150 Building demolition; complete as specified Lump Sum 1.00 1.00 $45,000.00 B1160 Utility service removal; complete as specified Lump Sum 1.00 1.00 $8,400.00 B1170 Light pole removal; complete as specified Each 1.00 0.00 -1.00 $100.00 ($100.00) B1700 Sawing existing pavement; complete as specified Liner Feet 90.00 96.00 6.00 $4.00 $24.00 B1904 Remove and replace HMA pavement; including sawing; fine grading; turf restoration; and traffic control; complete as specified Square Yards 24.00 35.90 11.90 $140.00 $1,666.00 B2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 6.00 6.00 $150.00 B2510 Sediment removal - Type D modified inlet protection; complete as specified Each 6.00 0.00 -6.00 $50.00 ($300.00) B2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 1.00 0.00 -1.00 $0.01 ($0.01) B2514 Furnish; install; maintain; and remove silt fence; complete as specified Liner Feet 860.00 821.60 -38.40 $3.00 ($115.20) B2600 Furnish and install topsoil 6" depth; complete as specified Square Yards 6,144.00 5,400.00 -744.00 $2.35 ($1,748.40) B2622 Furnish and install no-mow fescue; complete as specified Square Yards 6,144.00 5,400.00 -744.00 $1.11 ($825.84) B2644 Furnish and install hydraulically-applied erosion control product; complete as specified Square Yards 6,144.00 5,400.00 -744.00 $0.52 ($386.88) B2932 Import clay material; complete as specified Cubic Yards 2,500.00 1,200.00 -1,300.00 $13.70 ($17,810.00) B2937 Furnish and install clay dams; complete as specified Each 1.00 2.00 1.00 $850.00 $850.00 $2,540.00 ($23,445.76) WORK UNIT B WORK UNIT B (ITEMS B1050 - B2937) SUBTOTAL: Page 3 of 5 Docusign Envelope ID: AAAAF0CF-F933-431D-8EC7-D875F5F27F6D CONTRACT 23-29 CHANGE ORDER #1 (FINAL) ($20,905.76) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE C1050-1 Mobilization; complete as specified Lump Sum 1.00 1.00 $8,500.00 C2518-1 Furnish; install; maintain; and remove 12" diamter sediment logs; complete as specified Linear Feet 1,500.00 40.00 -1,460.00 $6.50 ($9,490.00) C3991-1 Remove and replace wellhead; valve; and bulkhead manholes; complete as specified Each 25.00 25.00 $3,700.00 $0.00 ($9,490.00) ($9,490.00) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE D1050-2 Mobilization; complete as specified Lump Sum 1.00 1.00 $6,000.00 D1225-2 Remove and dispose of waste pile; complete as specified Tons 2,100.00 0.00 -2,100.00 $17.86 ($37,506.00) D2512-2 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 1.00 0.00 -1.00 $0.01 ($0.01) D2514-2 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 355.00 358.00 3.00 $3.00 $9.00 D2600-2 Furnish and install topsoil 6" depth; complete as specified Square Yards 600.00 943.70 343.70 $6.45 $2,216.87 D2622-2 Furnish and install no-mow fescue; complete as specified Square Yards 600.00 943.70 343.70 $1.11 $381.51 D2644-2 Furnish and install hydraulically-applied erosion control product; complete as specified Square Yards 600.00 943.70 343.70 $0.52 $178.72 $2,786.10 ($37,506.01) ($34,719.91) WORK UNIT C WORK UNIT C (ITEMS C1050-1 - C3991-1) SUBTOTAL: WORK UNIT D WORK UNIT D (ITEMS D1050-2 - D2644-2) SUBTOTAL: NET DECREASE TO UNIT B: NET DECREASE TO UNIT C: NET DECREASE TO UNIT D: Page 4 of 5 Docusign Envelope ID: AAAAF0CF-F933-431D-8EC7-D875F5F27F6D CONTRACT 23-29 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE C-10000 Work Unit C MH adjustment of knockout tank; complete as specified Lump Sum 0.00 1.00 1.00 $500.00 $500.00 D-10000 Work Unit D eliminate D1225- 2 (change in unit price) remove and dispose of waste pile; complete as specified Tons 0.00 1,245.27 1245.27 $30.86 $38,429.03 $38,929.03 $0.00 $38,929.03 ($560.89) ($20,905.76) ($9,490.00) ($34,719.91) $38,929.03 ($26,747.53) NET DECREASE TO WORK UNIT D: NET DECREASE TO WORK UNIT C: NET DECREASE TO WORK UNIT A: NET DECREASE TO WORK UNIT B: NET DECREASE TO CONTRACT: ADDITIONAL WORK REQUIRED CO #1 ADDITIONAL WORK REQUIRED: CO #1 SUBTOTAL: NET INCREASE TO ADDITIONAL WORK: NET INCREASE TO ADDITIONAL WORK: Page 5 of 5 Docusign Envelope ID: AAAAF0CF-F933-431D-8EC7-D875F5F27F6D