Loading...
HomeMy WebLinkAboutWI Resource Ctr Hughes Hall B - DIS-012501278 Wisconsin Department of Safety and Professional Services Phone: 608-266-2112 Division of Industry Services Web: http://dsps.wi.gov 4822 Madison Yards Way Email: dsps@wisconsin.gov PO Box 7302 Madison, WI 53707 Tony Evers, Governor Dan Hereth, Secretary February 25, 2025 REQUEST FOR ADDITIONAL INFORMATION MUNICIPALITY: CITY OF OSHKOSH WINNEBAGO COUNTY SITE: WISCONSIN RESOURCE CENTER 1505 NORTH DRIVE OSHKOSH, WI 54985 FOR: 1505 NORTH DRIVE Object Type: HVAC ID No.: Wisconsin Resource Center - Hughes Hall Building B- HVAC Total Floor Area in Sq Ft: 15,000 The submittal described above has been placed on HOLD and the review and approval is pending subject to receipt of the ADDITIONAL INFORMATION and/or revised plans requested by this letter. Upon receipt of the additional information and/or revised plans, the plans will be reviewed for compliance to applicabl e Wisconsin Administrative Codes and Wisconsin Statutes. The KEY ITEM(S) must be corrected/revised and accompany the resubmittal. In your submittal, include a copy of this letter uti lizing the checkboxes to indicate completed items and include the location(s) to find the corrections or modifications with each re quest identified in the letter. You will have one opportunity to address ALL the items in this letter and your response must be submitted by the end of the day on Tuesday, March 4, 2025, or this submittal will be returned DENIED. Identification Numbers Application No.: DIS-012501278 Site ID No.: SIT-140485 Please refer to all identification numbers in each correspondence with the Department. WILLIAM EDWARDS GRUMMAN BUTKUS ASSOCIATES 1011 NORTH MAYFAIR ROAD WAUWATOSA, WISCONSIN 53226 DAVE JOHNSON ARCHITECTS GROUP LIMITED 1825 SOUTH WEBSTER, SUITE 202 GREEN BAY, WISCONSIN 54310 Object Type: Building Building Name.: Wisconsin Resource Center - Hughes Hall Building B Major Occupancy: I-3 - Detention & Correctional Class of Construction: IB - Fire Resistive Construction Building Review Type: Alteration Plan Type: Full/Complete Building Total Floor Area in Sq Ft: 15,000 Sprinklered Type: None Occupancy: Allowable Area Determined By: Structural Components Included in Review: None Alteration Level: 2 Designer responsible to provide comment to each item below so as to identify what changes were performed, and where the chang e can be found in the revised plan set. Please inform the reviewer when the revised plans and/or calculations have been upload ed for re- review. All re-submitted plans shall be complete plan sets inclusive of any revised sheets. The electronic plan set shall consist of a complete, single document (not a folder), with all plan sheets included in the order in which they are listed on the index, with proper revision date affixed to each modified sheet. SPS 361.31(2) - Designer shall identify plan revisions by a readily discernible means such as shading, highlighting, hatching or clouding the changed areas prior to plan resubmittal. Failure to do so will delay review. Division Project No. 22B2B KEY ITEM(S): SPS 302.31(1)(f) - Revised plans are required to be submitted to address the plan review comments and HOLD email. The fee for a plan re-submittal received prior to a denial action is $75 + $100 submittal fee = $175. Include electronic index sheets showing plan sheet revision dates, or update and/or include additional electronic files with their revision date on each. The index shall be properly stamped and signed by the licensed Wisconsin professional that prepared the plans, or each of the revised sheets shall be stamped, signed and dated by the licensed Wisconsin Professional if required by SPS 361.31(1). The revised submittal shall be one bound electronic set in accordance with SPS 361.31 (2)(b).  SPS 361.31(2)(e) - Provide additional calculations or information to substantiate that the submitted plans conform to this code:  Prior to plan resubmittal, the Supervising Professional shall identify on the building plans all fire barriers, fire partitio ns, fire walls, smoke barriers, smoke partitions and horizontal assemblies and their related fire resistive fire ratings. Due to the lack of identification on this building plan, this reviewer cannot verify whether or not there is need for additional fire, smoke or other dampers, or fire rated swing door installation. Why are the doors identified on sheet A102 addressed under notes 11 & 17 required to be fire rated? What fire rated assembly are they penetrat ing since the plans do not address any fire rated wall assemblies. A Designer responsible to address prior to plan resubmittal.  The resubmitted plans have yet to fully address the original request above. Sheet A100, et al, has statements which state “1 hr fire rated”, and “2 hr fire rated” which is not helpful when determining the use of the building and code compliance. As previously stated, the fire rated assemblies shall be called out as to its type of assembly and fire resistive rating such as, but not limited to, 1 hour fire barriers, 1 hr fire partitions; 2 hour fire walls, smoke barrier, smoke partitions, etc. Additionally, what is a “smoke wall” as identified on sheet A100, et al? IBC 717.5.5 and 717.5.7 address smoke barriers and smoke partitions, respectively. The referenced “Smoke Walls” are not identified in the code. Designer has yet to acceptably address.  Sheet M502, Note 11 references SPS 362.0707(1) -- Since most contractors do not have a set of codes available to them for reference in the field, the designer shall be responsible to identify on the plans, or the specifications, how the smoke damper is to actuate.  Sheet A102, Key Note 2 states “Existing window to be screwed shut from exterior with 6 stainless steel security screws, on exterior side, caulk perimeter of sash and frame. See Detail 3/A201”. Similar wording is associated with Key Note 8, et al. This action is NOT allowed. This action is in conflict with the installation instructions of the window assembly’s manufacturer’s installation instructions. Additionally, such action reduces the listed tested efficiency of the windows for their U-factor, causing them to be non-code compliant. Additionally, the Supervising Professional is informed by this letter that all new windows that are included as part of the actions related to this plan shall be required to meet IECC Table C402.4 for both U-factor and SHGC per IEBC 708, 811 & 908. Designer to address.  Per the plan re-submittal, Any reference on the plan sheet or in the specifications involving the use of screws to the various window assemblies for fixing the windows shall be remove d. Additionally, there shall be NO TACK WELDING associated with the window assemblies as referenced on sheet A102 footnote 18. The Department does not recognize the installation of required assemblies, equipment and appliances as acceptable when they are NOT installed per their listing or per the manufacturer’s installation ins tructions.  IBC 1611/SPS 362.1611 - Each roof portion shall sustain rain load, ponding instability, and controlled roof drain loads applied. Review SPS Table 382.38-1 Item 12 & footnote J. Designer to address requirements for a secondary roof -drain system which complements primary roof-drain system. Designer to modify roof loadings to address worst case roof loading due to water. Calculations shall be provided to justify design. Note that the secondary discharge shall be separate from the primary system, be directed to the ground surface AND be observable. Designer to address for all roofs of concern. See A105. Calculations to be provided to justify scupper design prior to plan resubmittal.  The re-submitted plans show a new roof drain, and an overflow drain. SPS 382.36(11)(d)4. The openings of the secondary roof drainage shall be not less than 2 inches and not more than 4 inches above the bottom opening of the primary roof drain. Designer has yet to address the height of the secondary drain relative to the primary drain on the building plans. Additionally, er SPS Table 382.38 -1, 12. Secondary roof drain Systems footnote J requires that secondary roof drain system discharge separate from the primary system and where observable. The submitted plans do not identify the location of the observable discharge. Designer has yet to acceptably address. Our agency offers various worksheets and checklists for the Commercial Building Code at https://dsps.wi.gov/Pages/Programs/CommercialBuildings that may assist you in preparing your submittal. Please login to your eSLA Dashboard to upload the requested additional information. Once logged in, navigate to your plan review and select Submit Additional Information from the Options menu. Be sure to pay the required fee(s) to complete the submission. The Department will review the resubmittal within 5 working days of receipt date. Identify plan revisions by a readily discernible means such as shading, highlighting, hatching, or clouding the changed areas prior to plan submitting the revised plans. Failure t o do so may delay review. If the above requested information and/or plans are not received by the end of the day on Tuesday, March 4, 2025, this submittal will be returned DENIED. No fees will be refunded, and a new fee, application form, and submittal of plans/specifications will be required should you desire to continue with this project. The code in effect at the time of new submittal would apply. Inquiries concerning this correspondence may be made to me at the contact information listed below. Sincerely, Randall R. Dahmen, PE/MS Commercial Building Code Consultant, Plan Reviewer & Inspector Division of Industry Services Phone: (608) 266-3162 Email: randy.dahmen@wisconsin.gov cc: BRIAN NOE, DIS COMMERCIAL BLDG INSPECTOR, 920-420-4796, BRIAN.NOE@WISCONSIN.GOV DIANE BARTLETT, MUNICIPAL CLERK, 920 236 5094, DBARTLETT@OSHKOSHWI.GOV JIM SCHAEFER, DIVISION OF FACILITIES DEVELOPMENT