HomeMy WebLinkAbout23-20 CO #1 (FINAL)_8-14-24TO: WOOD SEWER & EXCAVATING CHANGE ORDER #1 (FINAL) E9238 COUNTY RD X NEW LONDON, WI 54961 Your present contract with the City of Oshkosh, Contract No. 23-20, awarded May 9, 2023, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($62,666.49) $13,200.95 NET DECREASE TO CONTRACT ($49,465.54) SECTION I TOTALS BID TOTAL $830,256.73 $830,256.73 CO #1 ($49,465.54)($49,465.54) CONTRACT TOTAL $780,791.19 $780,791.19 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: AUGUST 14, 2024 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ NET INCREASE TO ADDITIONAL WORK: Docusign Envelope ID: 0FA2116C-171C-4CA8-B7BD-9FBDE9904771 CONTRACT 23-20 CHANGE ORDER #1 (FINAL) 23-20 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1010 Clearing; complete as specified Stations 1.85 1.85 $1,600.00 1020 Grubbing; complete as specified Stations 1.85 1.85 $1,600.00 1100 Removing pavement; complete as specified Square Yards 813.00 923.67 110.67 $7.00 $774.69 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 2,110.00 1,293.46 -816.54 $1.40 ($1,143.16) 1226 Dredge material; load; transport; and dispose of dewatered sediment; complete as specified Cubic Yards 25.00 0.00 -25.00 $77.50 ($1,937.50) 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 1,597.00 1,318.98 -278.02 $101.00 ($28,080.02) 1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 33.00 237.04 204.04 $107.00 $21,832.28 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 119.00 118.31 -0.69 $112.00 ($77.28) 1360 Adjust manholes and inlets; complete as specified Each 4.00 3.00 -1.00 $1,411.00 ($1,411.00) 1370 Turf restoration; complete as specified Square Yards 649.90 474.89 -175.01 $9.50 ($1,662.60) 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 1,525.00 978.14 -546.86 $9.00 ($4,921.74) 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 460.00 236.00 -224.00 $10.00 ($2,240.00) Page 2 of 5 Docusign Envelope ID: 0FA2116C-171C-4CA8-B7BD-9FBDE9904771 CONTRACT 23-20 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 895.00 200.00 -695.00 $2.40 ($1,668.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 124.00 129.00 5.00 $9.70 $48.50 1700 Sawing existing pavement; complete as specified Linear Feet 885.00 775.50 -109.50 $2.80 ($306.60) 1900 Tack coat; complete as specified Gallons 57.00 64.60 7.60 $7.90 $60.04 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 858.00 923.67 65.67 $61.00 $4,005.87 2001 Furnish and install 8" storm sewer; complete as specified Linear Feet 40.00 37.60 -2.40 $77.00 ($184.80) 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 825.00 438.50 -386.50 $80.50 ($31,113.25) 2004 Furnish and install 12" RCP Class III storm sewer; complete as specified Linear Feet 210.00 507.00 297.00 $89.50 $26,581.50 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 577.00 426.60 -150.40 $87.00 ($13,084.80) 2007 Furnish and install 15" RCP Class III storm sewer; complete as specified Linear Feet 121.00 134.50 13.50 $91.50 $1,235.25 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 190.00 158.00 -32.00 $515.00 ($16,480.00) 2016 Furnish and install 24" RCP Class III storm sewer; complete as specified Linear Feet 63.00 48.00 -15.00 $342.00 ($5,130.00) 2140 Furnish and install 12" RCP Class III apron endwall with joint ties; complete as specified Each 1.00 1.00 $2,872.00 2142 Furnish and install 18" RCP Class III apron endwall with joint ties; complete as specified Each 1.00 1.00 $2,598.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 46.07 42.95 -3.12 $974.00 ($3,038.88) 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 4.29 3.12 -1.17 $1,720.00 ($2,012.40) 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 4.00 3.00 -1.00 $3,692.00 ($3,692.00) Page 3 of 5 Docusign Envelope ID: 0FA2116C-171C-4CA8-B7BD-9FBDE9904771 CONTRACT 23-20 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 1,261.00 1,261.50 0.50 $100.00 $50.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 80.00 83.00 3.00 $40.00 $120.00 2406 Furnish and install storm sewer clay dams; complete as specified Each 41.00 42.00 1.00 $110.00 $110.00 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 15.00 19.00 4.00 $1,129.00 $4,516.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 65.00 24.00 -41.00 $85.00 ($3,485.00) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 49.00 22.00 -27.00 $12.00 ($324.00) 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 65.00 80.00 15.00 $18.00 $270.00 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 2.00 0.00 -2.00 $1,822.00 ($3,644.00) 2526 Furnish; install; maintain; and remove turbidity barrier; complete as specified Each 3.00 3.00 $4,980.00 2632 Furnish and install Class I; Urban; Type A erosion control mat; complete as specified Square Yards 308.00 381.28 73.28 $6.10 $447.01 2650 Furnish and install heavy rip- rap with filter fabric; complete as specified Square Yards 35.00 20.00 -15.00 $99.00 ($1,485.00) 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 159.00 56.00 -103.00 $5.70 ($587.10) 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 36.00 81.00 45.00 $32.50 $1,462.50 2810 Abandon storm sewer manholes and inlets; complete as specified Each 2.00 2.00 $911.00 2850 Connect to existing storm sewer main; complete as specified Each 27.00 35.00 8.00 $486.00 $3,888.00 2852 Connect to existing storm sewer main; complete as specified Each 2.00 6.00 4.00 $425.00 $1,700.00 Page 4 of 5 Docusign Envelope ID: 0FA2116C-171C-4CA8-B7BD-9FBDE9904771 CONTRACT 23-20 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2856 Connect to existing storm sewer manhole; complete as specified Each 4.00 3.00 -1.00 $618.00 ($618.00) 2858 Connect to existing storm sewer inlet; complete as specified Each 5.00 4.00 -1.00 $414.00 ($414.00) 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 1.00 0.00 -1.00 $1,027.00 ($1,027.00) SECTION I (BID ITEMS 1010 - 3114) - SUBTOTAL: $67,101.64 ($129,768.13) NET DECREASE TO SECTION I: ($62,666.49) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-1200 Unclassified excavation; complete as specified Cubic Yards 0.00 22.40 22.40 $41.40 $927.36 1-1440 30" curb and gutter; complete as specified Linear Feet 0.00 31.00 31.00 $75.00 $2,325.00 1-1801 Base aggregate dense; 1 1/4"; complete as specified Ton 0.00 44.80 44.80 $29.95 $1,341.76 1-2010 Furnish and install 18" RCP Class III storm sewer; complete as specified Linear Feet 0.00 25.00 25.00 $114.75 $2,868.75 1-2047 Furnish and install 19" x 30" HERCP Class III storm sewer; complete as specified Linear Feet 0.00 6.00 6.00 $194.75 $1,168.50 1-3120 Furnish and install sanitary sewer internal chimney seal; complete as specified Each 0.00 2.00 2.00 $1,225.00 $2,450.00 1-10000 Central Street additional work (mobilization/lateral inlet); complete as specified Lump Sum 0.00 1.00 1.00 $2,119.58 $2,119.58 $13,200.95 $0.00 $13,200.95 ($62,666.49) $13,200.95 ($49,465.54)NET DECREASE TO CONTRACT: ADDITIONAL WORK REQUIRED: CO #1 ADDITIONAL WORK REQUIRED: CO #1 SUBTOTAL: NET INCREASE: NET DECREASE TO SECTION I: NET INCREASE TO ADDITIONAL WORK: Page 5 of 5 Docusign Envelope ID: 0FA2116C-171C-4CA8-B7BD-9FBDE9904771