HomeMy WebLinkAbout0111347 BOSHKOSH
ON THE WATER
.lob Address 1810 MENOMINEE DR
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner CHARLES R BEHNKE TRUST
Contractor WRIGHTWAY INC
Category 141 - Exterior Remodeling
No 111347
Create Date 10/27/2004
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature SFR/Install steel siding on house and garage, replace gutters and downspouts, cover soffit, facia and trim. NO EIV PROVIDED - Any
of Work ~lectrical work requires an additional Electrical permit.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$13,450.00 Plan Approval $0.00 Permit Fee Paid
Permit Voided
$94.00 Park Dedication $0.00
Date 10/27/2004 Final/O.P. 00/00/0000
Parcel Id # 1512820000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address N6688 WRIGHTWAY DR FOND DU LAC WI 54937 - 0000 Telephone Number (920) 923-0721
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.