Loading...
HomeMy WebLinkAbout0111308-Building (roof) (a) CITY OF OSHKOSH No 111308 > OSHKOSH BUILDING PERMIT - APPLICATION AND REC(RR "fr \ ON THE WATER R 4 4 Job Address 1424 MONROE ST Owner CHRISTINE E RATCHMAN \` • %reate Date 10/26/2004 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ Re- roofing the house and attached garage - complete tear off. NO STRUCTURAL WORK. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,200.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Or" Date 10/26/2004 Final /O.P. 00 /00 /0000 ❑ Permit Voided I Parcel Id # 1507400000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary pNals before starting such activity. Signature i / 1Jt ALi h QUIV Date p7 /61 Agent/Owner Address 1424 MONROE ST OSHKOSH WI 54901 - 3058 Telephone Number To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.