HomeMy WebLinkAbout0111259-Building
e
OSHKOSH
ON THE WATER
Job Address 1705 WHITE SWAN DR
CITY OF OSHKOSH
No
111259
BUILDING PERMIT - APPLICATION AND RECORD
Owner
MARK A H SWIECA/RUSSELL L FIC
Create Date
1 0/25/2004
Designer
Contractor
PRECISION BUILDING PRODUCTS INC
Category
150 - New Accessory Buildings-Garages (Residential)
Plan
Type
18 Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
R-1
Class of Const:
VB
Size 24' x 28.5'
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 20 Ft.
Finished/Living ~ Sq. Ft. Bedrooms 0 Stories 1
Garage ~ Sq. Ft. Baths 0
U Projection 1
Canopies
0
Signs
0
Foundation 8 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
SFR/ Construct new 24' x 28.5' detached garage and driveway extension as per plans submitted.
Use/Nature
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$19,615.00
Plan Approval
$0.00 Permit Fee Paid
$124.00 Park Dedication
$0.00
Issued By:
Date 1 0/25/2004
Final/O.P. 00/00/0000
U Permit Voided 1
Parcelld # 1523030000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
295 W SCOTT ST
Agent/Owner
FOND DU LAC
WI 54937 - 0000 Telephone Number
920-923-1000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
(1051
~/~ (,/5',01:7
/<
L bl LrJé
3'--;;.1
3D'
I
1, T
s'
T r
III'
1
;J. v"
~¡
T
~3'E
}-\
I
t
'\
';2«1 ~ f}(M
"Z. e/ Iz. '
/8'9//
-1
k' tQ(/J~t:Jc.J
j'fÞH
r
C
r--\
m4~X $4Jí«I!.ið; '¡"-'i2.wsS",¿L F,¿.IIT.rl?-
j t¡oC ¿., j..)¡T.r ::"""111 "\:)ItIV~
6s4¡'¡osl/, wI _~-r¡"rol
,/
Y2~- 9.7tjtj
1
/~'
1
T
It/
k
!;'/IS/;,Ji" ~óLil)ew¡A'(