Loading...
HomeMy WebLinkAbout0111259-Building e OSHKOSH ON THE WATER Job Address 1705 WHITE SWAN DR CITY OF OSHKOSH No 111259 BUILDING PERMIT - APPLICATION AND RECORD Owner MARK A H SWIECA/RUSSELL L FIC Create Date 1 0/25/2004 Designer Contractor PRECISION BUILDING PRODUCTS INC Category 150 - New Accessory Buildings-Garages (Residential) Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-1 Class of Const: VB Size 24' x 28.5' Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 20 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories 1 Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 SFR/ Construct new 24' x 28.5' detached garage and driveway extension as per plans submitted. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $19,615.00 Plan Approval $0.00 Permit Fee Paid $124.00 Park Dedication $0.00 Issued By: Date 1 0/25/2004 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1523030000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 295 W SCOTT ST Agent/Owner FOND DU LAC WI 54937 - 0000 Telephone Number 920-923-1000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. (1051 ~/~ (,/5',01:7 /< L bl LrJé 3'--;;.1 3D' I 1, T s' T r III' 1 ;J. v" ~¡ T ~3'E }-\ I t '\ ';2«1 ~ f}(M "Z. e/ Iz. ' /8'9// -1 k' tQ(/J~t:Jc.J j'fÞH r C r--\ m4~X $4Jí«I!.ið; '¡"-'i2.wsS",¿L F,¿.IIT.rl?- j t¡oC ¿., j..)¡T.r ::"""111 "\:)ItIV~ 6s4¡'¡osl/, wI _~-r¡"rol ,/ Y2~- 9.7tjtj 1 /~' 1 T It/ k !;'/IS/;,Ji" ~óLil)ew¡A'(