Loading...
HomeMy WebLinkAbout0111254-Building CITY OF OSHKOSH r ��4,1'L �No 111254 OSHKOSH BUILDING PERMIT - APPLICATION AND RECO D"" >. ° ) ON THE WATER 'E Job Address 1135 POWERS ST Owner CATHERINE M SMITH Mate Date 10/22/2004 Designer Contractor PACKER VALLEY BUILDERS, INC Category 140 - Interior Remodeling Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ Repairing fire damge to interior and replacing the roof system over the west 1/2 of the house and garage, residing and reroofing, of Work replacing some windows. HVAC Contractor GRANT SCHULTZ HEATING & COOLING Plumbing Contractor Electric Contractor SCHAFER ELECTRIC INC Fees: Valuation $95,000.00 Plan Approval $0.00 Permit Fee Paid $349.00 Park Dedication $0.00 Issued By: Date 10/22/2004 Final /O.P. 00 /00 /0000 ❑ Permit Voided Parcel Id # 1109550000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t re any ne sa pprovals before starting such activity. Signature !-• Date }C /D ? — C9r Agent/Owner Address 2277 CLAIRVILLE ROAD OSHKOSH WI 54904 - 0000 Telephone Number 920 - 232 -7620 To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.