HomeMy WebLinkAbout22-18 CO #1 (FINAL)_3-5-25TO: VINTON CONST COMPANY CHANGE ORDER #1 (FINAL)
1322 33RD STREET
TWO RIVERS, WI 54241
Your present contract with the City of Oshkosh, Contract No. 22-18, awarded September 27, 2022, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($114,004.39)
NET INCREASE TO ADDITIONAL WORK:$75,910.91
NET DECREASE TO CONTRACT ($38,093.48)
SECTION I TOTALS
BID TOTAL $1,128,741.90 $1,128,741.90
CO #1 ($38,093.48)($38,093.48)
CONTRACT TOTAL $1,090,648.42 $1,090,648.42
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
DATE: MARCH 5, 2025
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
Docusign Envelope ID: D2386B92-BDCD-4B80-BA31-144359584D01
CONTRACT 22-18 CHANGE ORDER #1 (FINAL)
22-18
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1011
Clearing; complete as
specified
Inch
Diameter 100.00 84.00 -16.00 $35.00 ($560.00)
1021
Grubbing; complete as
specified
Inch
Diameter 120.00 84.00 -36.00 $35.00 ($1,260.00)
1050
Mobilization; complete as
specified
Lump
Sum 1.00 1.00 $78,500.00
1100
Removing pavement;
complete as specified
Square
Yards 650.00 180.44 -469.56 $9.00 ($4,226.04)
1110
Removing curb and gutter;
complete as specified
Linear
Feet 900.00 1,522.70 622.70 $6.00 $3,736.20
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 120.00 5,931.74 5811.74 $2.50 $14,529.35
1150
Remove; salvage; and
replace chain link fence;
complete as specified
Linear
Feet 225.00 182.00 -43.00 $52.00 ($2,236.00)
1200
Unclassified excavation;
complete as specified
Cubic
Yards 8,200.00 5,700.42 -2,499.58 $0.01 ($25.00)
1220
Excavation special (paving);
complete as specified Tons 120.00 0.00 -120.00 $20.00 ($2,400.00)
1301
7" concrete pavement; with
5" CABC and grading;
complete as specified
Square
Yards 110.00 109.33 -0.67 $70.00 ($46.90)
1333
8" concrete pavement speed
table; with 6" CABC and
grading; complete as
specified Each 3.00 3.00 $8,150.00
1370
Turf restoration; complete as
specified
Square
Yards 2,500.00 1,242.00 -1,258.00 $9.63 ($12,114.54)
1410
12" radius curb with 6"
CABC and grading;
complete as specified
Linear
Feet 60.00 81.00 21.00 $48.00 $1,008.00
1440
30" curb and gutter; 7"; with
5" CABC and grading;
complete as specified
Linear
Feet 775.00 1,150.50 375.50 $51.00 $19,150.50
1500
4" concrete sidewalk with 3"
CABC and grading;
complete as specified
Square
Feet 3,000.00 3,394.28 394.28 $7.65 $3,016.24
1510
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
specified
Square
Feet 2,500.00 1,599.15 -900.85 $8.40 ($7,567.14)
1540
Curb ramp detectable
warning field (natural/non-
painted); complete as
specified
Square
Feet 200.00 190.00 -10.00 $35.00 ($350.00)
Page 2 of 6
Docusign Envelope ID: D2386B92-BDCD-4B80-BA31-144359584D01
CONTRACT 22-18 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1550
No. 4 reinforcing rods -
deformed; epoxy-coated;
complete as specified
Linear
Feet 150.00 76.00 -74.00 $2.50 ($185.00)
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 40.00 26.00 -14.00 $6.00 ($84.00)
1580
Cold weather covering
(sidewalk) - single visquine;
complete as specified
Square
Feet 250.00 0.00 -250.00 $0.01 ($2.50)
1582
Cold weather covering
(sidewalk) - double visquine;
complete as specified
Square
Feet 250.00 0.00 -250.00 $0.01 ($2.50)
1584
Cold weather covering
(sidewalk) - double visquine
with 6" hay; complete as
specified
Square
Feet 250.00 0.00 -250.00 $0.01 ($2.50)
1590
Up-charge for late cold
weather concrete sidewalk;
complete as specified
Cubic
Yards 100.00 0.00 -100.00 $0.01 ($1.00)
1650
Locate existing property
monuments; complete as
specified Each 2.00 3.00 1.00 $200.00 $200.00
1652
Replace existing property
monuments; complete as
specified Each 2.00 3.00 1.00 $200.00 $200.00
1700
Sawing existing pavement;
complete as specified
Linear
Feet 600.00 186.00 -414.00 $2.50 ($1,035.00)
1801
Base aggregate dense; 1-
1/4"; complete as specified Tons 3,750.00 2,601.18 -1,148.82 $20.05 ($23,033.84)
1802
Base aggregate dense; 3";
complete as specified Tons 6,100.00 4,221.00 -1,879.00 $25.55 ($48,008.45)
1900
Tack coat; complete as
specified Gallons 1,200.00 663.00 -537.00 $3.94 ($2,115.78)
1901
HMA Pavement LT;
complete as specified Tons 4,150.00 3,814.00 -336.00 $90.50 ($30,408.00)
1903
HMA cold weather paving;
complete as specified Tons 200.00 0.00 -200.00 $0.01 ($2.00)
1960
Prepare foundation for
asphaltic paving; complete
as specified
Lump
Sum 1.00 1.00 $27,139.00
1974
Pavement markings; epoxy;
4" (white); complete as
specified
Linear
Feet 1,250.00 1,512.47 262.47 $4.00 $1,049.88
1975
Pavement markings; epoxy;
4" (yellow); complete as
specified
Linear
Feet 325.00 308.00 -17.00 $2.50 ($42.50)
1976
Pavement markings; epoxy;
8" (white); complete as
specified
Linear
Feet 60.00 70.00 10.00 $7.30 $73.00
Page 3 of 6
Docusign Envelope ID: D2386B92-BDCD-4B80-BA31-144359584D01
CONTRACT 22-18 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1977
Pavement markings; cross-
walk epoxy; 6" (white);
complete as specified
Linear
Feet 675.00 0.00 -675.00 $9.50 ($6,412.50)
1978
Pavement markings; stop-
line epoxy; 18" (white);
complete as specified
Linear
Feet 800.00 753.85 -46.15 $10.50 ($484.58)
1980
Pavement markings; arrow
epoxy; Type 2 (white);
complete as specified Each 4.00 4.00 $225.00
1981
Pavement markings; arrow
epoxy; Type 3 (white);
complete as specified Each 1.00 1.00 $250.00
1983
Pavement markings; word;
epoxy (white); complete as
specified Each 2.00 0.00 -2.00 $150.00 ($300.00)
1984
Pavement markings; symbol;
epoxy (white); complete as
specified Each 7.00 7.00 $215.00
2001
Furnish and install 8" storm
sewer; complete as specified
Linear
Feet 10.00 0.00 -10.00 $76.00 ($760.00)
2002
Furnish and install 10" storm
sewer; complete as specified
Linear
Feet 5.00 0.00 -5.00 $86.00 ($430.00)
2004
Furnish and install 12" RCP
Class III storm sewer;
complete as specified
Linear
Feet 700.00 654.00 -46.00 $73.10 ($3,362.60)
2007
Furnish and install 15" RCP
Class III storm sewer;
complete as specified
Linear
Feet 390.00 380.00 -10.00 $78.90 ($789.00)
2010
Furnish and install 18" RCP
Class III storm sewer;
complete as specified
Linear
Feet 45.00 77.00 32.00 $83.80 $2,681.60
2013
Furnish and install 21" RCP
Class III storm sewer;
complete as specified
Linear
Feet 8.00 0.00 -8.00 $126.00 ($1,008.00)
2016
Furnish and install 24" RCP
Class III storm sewer;
complete as specified
Linear
Feet 7.00 8.95 1.95 $142.00 $276.90
2201
Furnish and install standard
storm sewer manhole (4'
diameter); complete as
specified
Vertical
Feet 13.00 12.72 -0.28 $919.00 ($257.32)
2203
Furnish and install standard
storm sewer manhole (6'
diameter); complete as
specified
Vertical
Feet 2.90 2.78 -0.12 $1,139.00 ($136.67)
2213
Furnish and install standard
storm sewer inlet manhole
(4' diameter); complete as
specified
Vertical
Feet 14.90 13.55 -1.35 $1,059.00 ($1,429.65)
Page 4 of 6
Docusign Envelope ID: D2386B92-BDCD-4B80-BA31-144359584D01
CONTRACT 22-18 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2237
Furnish and install Type 3
inlet (with 18" sump);
complete as specified Each 18.00 18.00 $2,989.00
2508
Furnish; install; maintain;
and remove Type D modified
inlet protection; complete as
specified Each 46.00 23.00 -23.00 $108.32 ($2,491.36)
2510
Sediment removal - Type D
modified inlet protection;
complete as specified Each 46.00 23.00 -23.00 $9.88 ($227.24)
2516
Furnish; install; maintain;
and remove stone bag;
complete as specified Each 20.00 0.00 -20.00 $18.10 ($362.00)
2800
Abandon 8" - 12" storm
sewer; complete as specified
Linear
Feet 35.00 79.00 44.00 $10.00 $440.00
2850
Connect to existing storm
sewer main; complete as
specified Each 9.00 8.00 -1.00 $475.00 ($475.00)
2856
Connect to existing storm
sewer manhole; complete as
specified Each 2.00 3.00 1.00 $525.00 $525.00
2914
Storm sewer utility line
opening (ULO); complete as
specified Each 2.00 0.00 -2.00 $500.00 ($1,000.00)
2950
Excavation special (storm);
complete as specified Tons 150.00 0.00 -150.00 $15.00 ($2,250.00)
3113
Furnish and install standard
sanitary sewer manhole (2'
diameter); complete as
specified Each 2.50 2.35 -0.15 $743.00 ($111.45)
3114
Furnish and install sanitary
sewer external manhole
chimney seal; complete as
specified Each 2.00 1.00 -1.00 $610.00 ($610.00)
3116
Furnish and install sanitary
sewer external manhole
chimney seal extension;
complete as specified Each 1.00 0.00 -1.00 $415.00 ($415.00)
3250
Furnish and install 4"/6"
Schedule 80 sanitary sewer
lateral (relay); complete as
specified
Linear
Feet 100.00 84.00 -16.00 $95.00 ($1,520.00)
Page 5 of 6
Docusign Envelope ID: D2386B92-BDCD-4B80-BA31-144359584D01
CONTRACT 22-18 CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3710
Closed circuit televising -
using push camera;
complete as specified Each 1.00 0.00 -1.00 $350.00 ($350.00)
SECTION I (BID ITEMS 1011 - 3710) - SUBTOTAL: $46,886.67 ($160,891.06)
NET DECREASE TO SECTION I: ($114,004.39)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-10000
7" concrete pavement; steel
reinforcement upcharge;
complete as specified
Square
Yards 0.00 109.33 109.33 $51.60 $5,641.43
1-10001
12" floating curb; complete
as specified
Linear
Feet 0.00 347.70 347.70 $48.00 $16,689.60
1-10002
Lost time due to archaeology
impacts (9/11/23 - 9/15/23);
complete as specified
Lump
Sum 0.00 1.00 1.00 $32,415.00 $32,415.00
1-10003
Lost time due to archaeology
impacts (5/22/24 - 5/24/24);
complete as specified
Lump
Sum 0.00 1.00 1.00 $17,555.52 $17,555.52
1-10004
Remove existing concrete
culvert; complete as
specified
Lump
Sum 0.00 1.00 1.00 $1,211.86 $1,211.86
1-10005
Moving conduit in sewer
trench; complete as
specified
Lump
Sum 0.00 1.00 1.00 $2,397.50 $2,397.50
$75,910.91 $0.00
$75,910.91
($114,004.39)
$75,910.91
($38,093.48)
ADDITIONAL WORK REQUIRED:
NET INCREASE:
NET DECREASE TO CONTRACT:
NET DECREASE TO SECTION I:
NET INCREASE TO ADDITIONAL WORK:
ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 1-10000 - 1-10005) SUBTOTAL:
Page 6 of 6