Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
0111118-Building (sign cabinet)
OSHKOSH ON THE WATER .lob Address 1820 S KOELLER ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner R4J INVESTMENTS LLC Contractor BAUER SIGN CO Category 254 - Signs No 111118 Create Date 10/14/2004 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain No Height Permit # Dwelling Units 0 # Structures Size ~J Projection Canopies Signs Not Required Use/Nature Sign / Add a new double faced cabinet 2' 1 - 1/2" x 12' 3" to existing pylon sign as per plans. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,100.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $32.00 Park Dedication $0.00 Date 10/14/2004 Final/O.P. 00/00/0000 Parcel Id # 1307440113 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address W184 S8408 CHALLENGER DR Agent/Owner MUSKEG© WI 53150 - 0000 Telephone Number 262-679-2500 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.