HomeMy WebLinkAbout24-14 CO 1 (FINAL)_1-28-25TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER #1 (FINAL)
P.O. BOX 137
TWO RIVERS, WI 54241
Your present contract with the City of Oshkosh, Contract No. 24-14, awarded April 23, 2024, is hereby amended
and changed as follows:
NET DECREASE TO SECTION I: ($27,270.39)
NET INCREASE TO ADDITIONAL WORK:$963.95
NET DECREASE TO CONTRACT ($26,306.44)
SECTION I TOTALS
BID TOTAL $333,583.69 $333,583.69
CO #1 ($26,306.44)($26,306.44)
CONTRACT TOTAL $307,277.25 $307,277.25
CITY OF OSHKOSH
BY:
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
DATE: JANUARY 28, 2025
______________________________
Comptroller
______________________________
Contractor
______________________________
Approved and accepted:
______________________________
City Manager
City Clerk
______________________________
Docusign Envelope ID: 74916E77-1F85-4ABB-AACB-9EE52E2B307F
CONTRACT 24-14 - CHANGE ORDER #1 (FINAL)
24-14
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1010
Clearing; complete as
specified Stations 1.00 1.00 $2,100.00
1020
Grubbing; complete as
specified Stations 1.00 1.00 $1,000.00
1050
Mobilization; complete as
specified
Lump
Sum 1.00 1.00 $20,000.00
1110
Removing curb and gutter;
complete as specified
Linear
Feet 330.00 297.36 -32.64 $10.00 ($326.40)
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified
Square
Feet 720.00 832.03 112.03 $1.20 $134.44
1200
Unclassified excavation;
complete as specified
Cubic
Yards 2,050.00 1,974.15 -75.85 $19.75 ($1,498.04)
1220
Excavation special (paving);
complete as specified Tons 300.00 0.00 -300.00 $0.01 ($3.00)
1350
Pavement ties; complete as
specified Each 90.00 61.00 -29.00 $8.00 ($232.00)
1360
Adjust manholes and inlets;
complete as specified Each 17.00 13.00 -4.00 $450.00 ($1,800.00)
1370
Turf restoration; complete as
specified
Square
Yards 392.00 392.00 $15.75
1410
12" radius curb with 6"
CABC and grading;
complete as specified
Linear
Feet 75.00 71.43 -3.57 $10.00 ($35.70)
1440
30" curb and gutter; 7"; with
5" CABC and grading;
complete as specified
Linear
Feet 340.00 297.66 -42.34 $48.00 ($2,032.32)
1460
Sidewalk curb; complete as
specified
Linear
Feet 25.00 0.00 -25.00 $35.00 ($875.00)
1500
4" concrete sidewalk with 3"
CABC and grading;
complete as specified
Square
Feet 400.00 386.85 -13.15 $10.50 ($138.08)
1510
6" concrete sidewalk
/driveway/ramp with 3"
CABC and grading;
complete as specified
Square
Feet 440.00 519.93 79.93 $12.50 $999.12
1540
Curb ramp detectable
warning field (natural/non-
painted); complete as
specified
Square
Feet 40.00 40.00 $35.00
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 19.00 12.00 -7.00 $6.00 ($42.00)
1580
Cold weather covering
(sidewalk) - single visquine;
complete as specified
Square
Feet 130.00 0.00 -130.00 $0.01 ($1.30)
Page 2 of 5
Docusign Envelope ID: 74916E77-1F85-4ABB-AACB-9EE52E2B307F
CONTRACT 24-14 - CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1582
Cold weather covering
(sidewalk) - double visquine;
complete as specified
Square
Feet 130.00 0.00 -130.00 $0.01 ($1.30)
1590
Up-charge for late season
cold weather concrete
sidewalk; complete as
specified
Cubic
Yards 2.00 0.00 -2.00 $0.01 ($0.02)
1650
Locate existing property
monuments; complete as
specified Each 3.00 3.00 $300.00
1652
Replace existing property
monuments; complete as
specified Each 3.00 3.00 $50.00
1700
Sawing existing pavement;
complete as specified
Linear
Feet 160.00 154.06 -5.94 $3.50 ($20.79)
1801
Base aggregate dense; 1-
1/4"; complete as specified Tons 1,150.00 1,232.00 82.00 $14.50 $1,189.00
1802
Base aggregate dense; 3";
complete as specified Tons 1,900.00 1,650.00 -250.00 $14.50 ($3,625.00)
1900
Tack coat; complete as
specified Gallons 360.00 350.00 -10.00 $2.78 ($27.80)
1901
HMA Pavement LT;
complete as specified Tons 1,300.00 1,171.20 -128.80 $75.85 ($9,769.47)
1903
HMA cold weather paving;
complete as specified Tons 200.00 0.00 -200.00 $0.01 ($2.00)
1960
Prepare foundation for
asphaltic paving; complete
as specified
Lump
Sum 1.00 1.00 $7,500.00
2004
Furnish and install 12" RCP
Class III storm sewer;
complete as specified
Linear
Feet 65.00 57.00 -8.00 $120.45 ($963.60)
2010
Furnish and install 18" RCP
Class III storm sewer;
complete as specified
Linear
Feet 150.00 144.00 -6.00 $108.55 ($651.30)
2142
Furnish and install 18" RCP
Class III apron endwall with
joint ties; complete as
specified Each 1.00 1.00 $2,355.00
2213
Furnish and install standard
storm sewer inlet manhole
(4' diameter); complete as
specified
Vertical
Feet 4.00 3.84 -0.16 $1,035.00 ($165.60)
2237
Furnish and install Type 3
inlet (with 18" sump);
complete as specified Each 2.00 2.00 $3,500.00
2508
Furnish; install; maintain;
and remove Type D modified
inlet protection; complete as
specified Each 12.00 10.00 -2.00 $135.00 ($270.00)
Page 3 of 5
Docusign Envelope ID: 74916E77-1F85-4ABB-AACB-9EE52E2B307F
CONTRACT 24-14 - CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
2510
Sediment removal - Type D
modified inlet protection;
complete as specified Each 12.00 0.00 -12.00 $5.00 ($60.00)
2512
Furnish; install; maintain;
and remove stone tracking
pad; complete as specified Each 1.00 0.00 -1.00 $0.01 ($0.01)
2516
Furnish; install; maintain;
and remove stone bag;
complete as specified Each 15.00 0.00 -15.00 $22.00 ($330.00)
2518
Furnish; install; maintain;
and remove 12" diameter
sediment logs; complete as
specified
Linear
Feet 40.00 20.00 -20.00 $12.00 ($240.00)
2524
Furnish; install; maintain;
and remove dewatering tank
system; complete as
specified Each 1.00 0.00 -1.00 $0.01 ($0.01)
2526
Furnish; install; maintain;
and remove turbidity barrier;
complete as specified Each 1.00 1.00 $2,600.00
2632
Furnish and install Class I;
Urban; Type A erosion
control mat; complete as
specified
Square
Yards 60.00 59.02 -0.98 $3.00 ($2.94)
2648
Furnish and install medium
rip-rap with filter fabric;
complete as specified
Square
Yards 30.00 28.12 -1.88 $80.00 ($150.40)
2800
Abandon 8" - 12" storm
sewer; complete as specified
Linear
Feet 200.00 177.70 -22.30 $15.60 ($347.87)
2810
Abandon storm sewer
manholes and inlets;
complete as specified Each 2.00 2.00 $620.00
2850
Connect to existing storm
sewer main; complete as
specified Each 3.00 3.00 $485.00
2950
Excavation special (storm);
complete as specified Tons 100.00 0.00 -100.00 $0.01 ($1.00)
3002
Furnish and install 10"
sanitary sewer (relay);
complete as specified
Linear
Feet 15.00 4.00 -11.00 $510.00 ($5,610.00)
3114
Furnish and install sanitary
sewer external manhole
chimney seal; complete as
specified Each 4.00 4.00 $455.00
3116
Furnish and install sanitary
sewer external manhole
chimney seal extension;
complete as specified Each 1.00 0.00 -1.00 $370.00 ($370.00)
Page 4 of 5
Docusign Envelope ID: 74916E77-1F85-4ABB-AACB-9EE52E2B307F
CONTRACT 24-14 - CHANGE ORDER #1 (FINAL)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
3302
Furnish and install
connection to existing 10"
sanitary sewer mains;
complete as specified Each 4.00 4.00 $2,062.00
SECTION I (BID ITEMS 1010 - 3302) - SUBTOTAL: $2,322.56 ($29,592.95)
NET DECREASE TO SECTION I: ($27,270.39)
ITEM
NUMBER DESCRIPTION UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
1-10000
23-25 S Koeller extra
restoration; complete as
specified
Lump
Sum 0.00 1.00 1.00 $963.95 $963.95
$963.95 $0.00
$963.95
($27,270.39)
$963.95
NET DECREASE TO CONTRACT: ($26,306.44)
ADDITIONAL WORK REQUIRED: FUTURE CO #1
ADDITIONAL WORK (ITEMS ) SUBTOTAL:
NET INCREASE:
NET INCREASE TO ADDITIONAL WORK:
NET DECREASE TO SECTION I:
Page 5 of 5
Docusign Envelope ID: 74916E77-1F85-4ABB-AACB-9EE52E2B307F