Loading...
HomeMy WebLinkAbout0110967 BOSHKOSH ON THE WATER .lob .Address 1643 NEBRASKA ST Designer Category CITY OF OSHKOSH No BUILDING PERMIT - APPLICATION AND RECORD Owner DANIEL J/DEBRA PERRY Create Date Contractor OWNER 150 - New Accessory Buildings-Garages (Residential) Plan 110967 10/08/2004 Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation ~ Poured Concrete O Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/RENEWAL OF PERMIT # 93366 - Detached 26' x 30' garage with 24' wide x 73' long driveway. of Work Seperate permit required for Electrical work. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $6,200.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $56.00 Park Dedication $0.00 Date 10/08/2004 Final/O.P. 00/00/0000 Parcel Id # 0305740000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1643 NEBRASKA ST OSHKOSH WI 54902 - 6917 Telephone Number 233-1293 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.