HomeMy WebLinkAbout22-01 CO #1 (Final)_1-3-25TO: PTS CONTRACTORS, INC. 4075 EATON ROAD GREEN BAY, WI 54311 Your present contract with the City of Oshkosh, Contract No. 22-01, awarded April 12, 2022, is hereby amended and changed as follows: $91,458.75 ($16,492.00) $285,994.43 $360,961.18 SECTION I TOTALS BID TOTAL $4,806,149.51 $4,806,149.51 CO #1 $360,961.18 $360,961.18 $5,167,110.69 $5,167,110.69 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney NET INCREASE TO ADDITIONAL WORK: NET INCREASE TO SECTION I: CHANGE ORDER #1 (FINAL) DATE: JANUARY 3, 2025 CONTRACT TOTAL NET INCREASE TO CONTRACT NET DECRESE TO ALTERNATE 2: ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) 22-01 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $440,215.00 1100 Removing pavement; complete as specified Square Yards 11,500.00 13,585.80 2,085.80 $2.30 $4,797.34 1110 Removing curb and gutter; complete as specified Linear Feet 60.00 71.00 11.00 $6.00 $66.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 1,750.00 8,470.00 6,720.00 $1.00 $6,720.00 1200 Unclassified excavation; complete as specified Cubic Yards 1,900.00 2,247.40 347.40 $21.40 $7,434.36 1220 Excavation special (paving); complete as specified Tons 60.00 0.00 -60.00 $11.00 ($660.00) 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 55.00 77.00 22.00 $114.00 $2,508.00 1314A 8" concrete pavement doweled; with 6" CABC and grading; complete as specified Square Yards 10,000.00 11,683.01 1,683.01 $53.75 $90,461.79 1315 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as specified Square Yards 1,250.00 1,801.50 551.50 $73.90 $40,755.85 1334 Concrete pavement gaps; complete as specified Each 2.00 5.00 3.00 $1,295.00 $3,885.00 1350 Pavement ties; complete as specified Each 850.00 725.00 -125.00 $9.00 ($1,125.00) 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 240.00 414.00 174.00 $15.00 $2,610.00 1360 Adjust manholes and inlets; complete as specified Each 55.00 57.00 2.00 $465.00 $930.00 1370 Turf restoration; complete as specified Square Yards 750.00 1,576.00 826.00 $9.00 $7,434.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 1,000.00 0.00 -1,000.00 $0.01 ($10.00) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 1,000.00 0.00 -1,000.00 $0.01 ($10.00) 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 1,000.00 0.00 -1,000.00 $0.01 ($10.00) Page 2 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 335.00 0.00 -335.00 $0.01 ($3.35) 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 200.00 250.00 50.00 $13.50 $675.00 1442 30" curb and gutter; 8"; with 6" CABC and grading; complete as specified Linear Feet 60.00 71.00 11.00 $47.00 $517.00 1460 Sidewalk curb; complete as specified Linear Feet 75.00 0.00 -75.00 $26.00 ($1,950.00) 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 1,000.00 1,787.00 787.00 $7.25 $5,705.75 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,800.00 5,666.00 3,866.00 $7.25 $28,028.50 1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 100.00 140.00 40.00 $37.00 $1,480.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 110.00 240.00 130.00 $2.05 $266.50 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 45.00 120.00 75.00 $6.25 $468.75 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 250.00 0.00 -250.00 $0.01 ($2.50) 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 250.00 0.00 -250.00 $0.01 ($2.50) 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 250.00 0.00 -250.00 $0.01 ($2.50) 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 100.00 0.00 -100.00 $0.01 ($1.00) 1650 Locate existing property monuments; complete as specified Each 10.00 19.00 9.00 $156.00 $1,404.00 1652 Replace existing property monuments; complete as specified Each 10.00 6.00 -4.00 $52.00 ($208.00) 1700 Sawing existing pavement; complete as specified Linear Feet 400.00 230.00 -170.00 $5.00 ($850.00) 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 3,300.00 2,810.00 -490.00 $3.00 ($1,470.00) Page 3 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1900 Tack coat; complete as specified Gallons 2.00 2.00 $3.00 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 150.00 21.20 -128.80 $80.00 ($10,304.00) 1911 4" asphaltic transition LT with 10" CABC and grading; complete as specified Square Yards 40.00 123.66 83.66 $80.00 $6,692.80 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 20.00 155.40 135.40 $70.00 $9,478.00 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 1,100.00 1,595.60 495.60 $1.30 $644.28 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 5,350.00 5,142.30 -207.70 $1.30 ($270.01) 1978 Pavement markings; stop-line epoxy; 18" (white); complete as specified Linear Feet 25.00 22.50 -2.50 $12.50 ($31.25) 1980 Pavement markings; arrow epoxy; Type 2 (white); complete as specified Each 1.00 1.00 $235.00 1983 Pavement markings; word; epoxy (white); complete as specified Each 1.00 1.00 $260.00 2001 Furnish and install 8" storm sewer; complete as specified Linear Feet 10.00 0.00 -10.00 $137.00 ($1,370.00) 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 15.00 32.00 17.00 $148.00 $2,516.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 290.00 342.50 52.50 $83.00 $4,357.50 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 85.00 122.00 37.00 $104.00 $3,848.00 2012 Furnish and install 21" storm sewer; complete as specified Linear Feet 55.00 18.00 -37.00 $155.00 ($5,735.00) 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 5.00 0.00 -5.00 $221.00 ($1,105.00) 2059 Furnish and install 48" x 76" HERCP Class III storm sewer; complete as specified Linear Feet 775.00 763.00 -12.00 $300.00 ($3,600.00) 2061 Furnish and install 53" x 83" HERCP Class III storm sewer; complete as specified Linear Feet 400.00 406.00 6.00 $372.00 $2,232.00 2063 Furnish and install 58" x 91" HERCP Class III storm sewer; complete as specified Linear Feet 550.00 544.00 -6.00 $438.00 ($2,628.00) 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 3.25 3.09 -0.16 $556.00 ($88.96) Page 4 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Vertical Feet 3.75 8.75 5.00 $585.00 $2,925.00 2225A Furnish and install storm sewer junction chamber manhole N-20; complete as specified Each 1.00 1.00 $23,315.00 2225B Furnish and install storm sewer junction chamber manhole N-21; complete as specified Each 1.00 1.00 $23,315.00 2225C Furnish and install storm sewer junction chamber manhole N-22; complete as specified Each 1.00 1.00 $23,315.00 2225D Furnish and install storm sewer junction chamber manhole N-23; complete as specified Each 1.00 1.00 $24,586.00 2225E Furnish and install storm sewer junction chamber manhole N-24; complete as specified Each 1.00 1.00 $24,586.00 2225F Furnish and install storm sewer junction chamber manhole N-26; complete as specified Each 1.00 1.00 $26,245.00 2225G Furnish and install storm sewer junction chamber manhole N-27; complete as specified Each 1.00 1.00 $26,245.00 2225H Furnish and install storm sewer junction chamber manhole N-28; complete as specified Each 1.00 1.00 $26,245.00 2225I Furnish and install storm sewer junction chamber manhole N-29; complete as specified Each 1.00 1.00 $43,310.00 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 1.00 0.00 -1.00 $3,020.00 ($3,020.00) 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 12.00 14.00 2.00 $2,280.00 $4,560.00 2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 20.00 15.00 -5.00 $89.00 ($445.00) 2404 Furnish and install storm sewer marker balls; complete as specified Each 2.00 3.00 1.00 $62.00 $62.00 2406 Furnish and install storm sewer clay dams; complete as specified Each 1.00 0.00 -1.00 $115.00 ($115.00) Page 5 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 40.00 38.00 -2.00 $75.00 ($150.00) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 40.00 38.00 -2.00 $5.25 ($10.50) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 50.00 50.00 $11.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 125.00 128.00 3.00 $21.00 $63.00 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 1,150.00 1,150.00 $18.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 100.00 283.00 183.00 $35.00 $6,405.00 2810 Abandon storm sewer manholes and inlets; complete as specified Each 6.00 1.00 -5.00 $450.00 ($2,250.00) 2812 Remove storm sewer manholes and inlets; complete as specified Each 4.00 6.00 2.00 $575.00 $1,150.00 2850 Connect to existing storm sewer main; complete as specified Each 4.00 5.00 1.00 $1,055.00 $1,055.00 2852 Connect to existing storm sewer lateral; complete as specified Each 2.00 3.00 1.00 $315.00 $315.00 2856 Connect to existing storm sewer manhole; complete as specified Each 5.00 3.00 -2.00 $1,230.00 ($2,460.00) 2858 Connect to existing storm sewer inlet; complete as specified Each 1.00 0.00 -1.00 $680.00 ($680.00) 2914 Storm sewer utility line opening (ULO); complete as specified Each 2.00 0.00 -2.00 $580.00 ($1,160.00) 2950 Excavation special (storm); complete as specified Tons 150.00 0.00 -150.00 $57.00 ($8,550.00) 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 55.00 61.00 6.00 $190.00 $1,140.00 3010 Furnish and install 21" sanitary sewer (relay); complete as specified Linear Feet 15.00 14.50 -0.50 $290.00 ($145.00) 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 10.00 18.00 8.00 $388.00 $3,104.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 12.30 12.25 -0.05 $292.00 ($14.60) Page 6 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3113 Furnish and install sanitary junction chamber manhole N- 10; complete as specified Each 1.00 0.00 -1.00 $29,500.00 ($29,500.00) 3114 Furnish and install external sanitary sewer manhole chimney seal; complete as specified Each 10.00 11.00 1.00 $518.00 $518.00 3116 Furnish and install external sanitary sewer manhole chimney seal extension; complete as specified Each 1.00 1.00 $466.00 3222 Furnish and install 6" sanitary sewer "Insert-A-Tee" or "Kor- N-Tee"; complete as specified Each 8.00 9.00 1.00 $320.00 $320.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 64.00 247.50 183.50 $145.00 $26,607.50 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 26.00 4.50 -21.50 $120.00 ($2,580.00) 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 16.00 17.00 1.00 $74.00 $74.00 3238 Furnish and install clay dams; complete as specified Each 8.00 5.00 -3.00 $115.00 ($345.00) 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 2.00 2.00 $1,785.00 3310 Furnish and install connection to existing 21" sanitary sewer mains; complete as specified Each 1.00 1.00 $3,775.00 3320 Furnish and install connection to existing 48" sanitary sewer mains; complete as specified Each 1.00 1.00 $309,540.55 3329 Connect to existing 14" sanitary sewer force mains; complete as specified Each 1.00 1.00 $40,500.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 1.00 0.00 -1.00 $3,320.00 ($3,320.00) 3514 Furnish and install trenchless 66" sanitary sewer casing pipe; complete as specified Linear Feet 35.00 0.00 -35.00 $2,830.00 ($99,050.00) 3600 Rock excavation; complete as specified Cubic Yards 2,400.00 0.00 -2,400.00 $0.01 ($24.00) 3700 Closed circuit televising; complete as specified Linear Feet 2,710.00 2,692.50 -17.50 $1.80 ($31.50) 3710 Closed circuit televising - using push camera; complete as specified Each 2.00 1.00 -1.00 $695.00 ($695.00) Page 7 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3800 Abandon sanitary sewer manholes; complete as specified Each 4.00 3.00 -1.00 $565.00 ($565.00) 3855 Abandon 14" sanitary sewer force main; complete as specified Linear Feet 1,450.00 1,450.00 $14.00 3856 Abandon 20" sanitary sewer force main; complete as specified Linear Feet 7,950.00 7,950.00 $14.00 3860 Abandon and raze Murdock Avenue lift station; complete as specified Each 1.00 0.76 -0.24 $31,750.00 ($7,500.00) 3861 Abandon and raze Bowen Street lift station; complete as specified Each 1.00 1.00 $31,790.00 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 2.00 1.00 -1.00 $575.00 ($575.00) 3892 Excavation special (sanitary); complete as specified Tons 150.00 0.00 -150.00 $57.00 ($8,550.00) 3973 Furnish and install additional grout; complete as specified Gallons 50.00 0.00 -50.00 $26.00 ($1,300.00) 3990 Furnish and install chemical protection coating; complete as specified Vertical Feet 130.00 114.90 -15.10 $145.00 ($2,189.50) 3991 Furnish manhole chemical protection coating set-up; complete as specified Each 9.00 8.00 -1.00 $205.00 ($205.00) 4000 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 55.00 119.50 64.50 $165.00 $10,642.50 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 200.00 117.60 -82.40 $160.00 ($13,184.00) 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 80.00 65.00 -15.00 $175.00 ($2,625.00) 4010 Furnish and install 16" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 75.00 83.00 8.00 $235.00 $1,880.00 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 141.00 364.50 223.50 $109.00 $24,361.50 4040 Furnish and install 2" water service (relay); complete as specified Linear Feet 94.00 59.00 -35.00 $128.00 ($4,480.00) 4048 Furnish and install 1" corporation and stop box; complete as specified Each 3.00 8.00 5.00 $609.00 $3,045.00 Page 8 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4053 Furnish and install 2" corporation and stop box; complete as specified Each 2.00 1.00 -1.00 $1,725.00 ($1,725.00) 4055 Furnish and install water service clay dams; complete as specified Each 5.00 12.00 7.00 $115.00 $805.00 4056 Furnish and install connections to existing 4" water main; complete as specified Each 2.00 2.00 $2,515.00 4058 Furnish and install connections to existing 6" water main; complete as specified Each 4.00 2.00 -2.00 $2,815.00 ($5,630.00) 4060 Furnish and install connections to existing 8" water main; complete as specified Each 5.00 3.00 -2.00 $3,255.00 ($6,510.00) 4066 Furnish and install connections to existing 16" water main; complete as specified Each 2.00 6.00 4.00 $4,445.00 $17,780.00 4101 Furnish and install 6" x 6" water main tee; complete as specified Each 1.00 0.00 -1.00 $530.00 ($530.00) 4137 Furnish and install 16" x 6" water main tee; complete as specified Each 1.00 1.00 $2,055.00 4235 Furnish and install 4" 45 degree water main bend; complete as specified Each 6.00 6.00 $235.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 14.00 6.00 -8.00 $350.00 ($2,800.00) 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 8.00 8.00 $450.00 4240 Furnish and install 16" 45 degree water main bend; complete as specified Each 4.00 8.00 4.00 $1,775.00 $7,100.00 4262 Furnish and install 6" x 4" water main reducer; complete as specified Each 1.00 1.00 $300.00 4352 Cut and cap existing 6" water main; complete as specified Each 1.00 2.00 1.00 $1,000.00 $1,000.00 4354 Cut and cap existing 8" water main; complete as specified Each 1.00 0.00 -1.00 $1,070.00 ($1,070.00) 4360 Cut and cap existing 16" water main; complete as specified Each 2.00 0.00 -2.00 $2,565.00 ($5,130.00) 4401 Furnish and install 6" water main gate valve; complete as specified Each 2.00 1.00 -1.00 $1,885.00 ($1,885.00) Page 9 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4405 Furnish and install 16" water main gate valve; complete as specified Each 1.00 2.00 1.00 $10,100.00 $10,100.00 4419 Furnish and install 6" x 6" tapping valve and sleeve; complete as specified Each 1.00 5.00 4.00 $3,555.00 $14,220.00 4428 Furnish and install 8" x 6" tapping valve and sleeve; complete as specified Each 1.00 0.00 -1.00 $3,524.00 ($3,524.00) 4455 Furnish and install 16" x 6" tapping valve and sleeve; complete as specified Each 4.00 1.00 -3.00 $4,805.00 ($14,415.00) 4500 Furnish and install hydrant; complete as specified Each 4.00 3.00 -1.00 $2,660.00 ($2,660.00) 4720 Furnish and install 10" water main casing pipe; complete as specified Linear Feet 15.00 9.00 -6.00 $212.00 ($1,272.00) 4722 Furnish and install 12" water main casing pipe; complete as specified Linear Feet 15.00 21.00 6.00 $212.00 $1,272.00 4724 Furnish and install 16" water main casing pipe; complete as specified Linear Feet 25.00 0.00 -25.00 $265.00 ($6,625.00) 4728 Furnish and install 20" water main casing pipe; complete as specified Linear Feet 15.00 11.00 -4.00 $295.00 ($1,180.00) 4900 Abandon water main on Bowen Street; complete as specified Lump Sum 1.00 1.00 $3,900.00 4990 Excavation special (water); complete as specified Tons 50.00 0.00 -50.00 $57.00 ($2,850.00) SECTION I (BID ITEMS 1050 - 4990) SUBTOTAL: $376,420.92 ($284,962.17) $91,458.75 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3050-2 Furnish and install 48" HOBAS sanitary sewer (new); complete as specified Linear Feet 2,630.00 2,599.00 -31.00 $532.00 ($16,492.00) 3113A-2 Furnish and install sanitary HOBAS Base T manhole N-1; complete as specified Each 1.00 1.00 $15,103.06 3113B-2 Furnish and install sanitary HOBAS Base T manhole N-2; complete as specified Each 1.00 1.00 $15,103.06 3113C-2 Furnish and install sanitary HOBAS Base T manhole N-3; complete as specified Each 1.00 1.00 $15,103.07 3113D-2 Furnish and install sanitary HOBAS Base T manhole N-4; complete as specified Each 1.00 1.00 $15,103.06 NET INCREASE: ALTERNATE 2 Page 10 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3113E-2 Furnish and install sanitary HOBAS Base T manhole N-6; complete as specified Each 1.00 1.00 $15,103.07 3113F-2 Furnish and install sanitary HOBAS Base T manhole N-7; complete as specified Each 1.00 1.00 $15,103.06 3113G-2 Furnish and install sanitary HOBAS Base T manhole N-8; complete as specified Each 1.00 1.00 $15,103.07 3113H-2 Furnish and install sanitry HOBAS Base T manhole N-9; complete as specified Each 1.00 1.00 $15,103.06 $0.00 ($16,492.00) ($16,492.00) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-3104 6' sanitary manhole; complete as specified Vertical Feet 0.00 11.42 11.42 $990.00 $11,305.80 1-3332 Core into existing sanitary sewer manhole 15-3044; complete as specified Lump Sum 0.00 1.00 1.00 $26,517.17 $26,517.17 1-3512 60" casing pipe in lieu of 66"; complete as specified Linear Feet 0.00 40.00 40.00 $2,830.00 $113,200.00 1-4037 1.25" water lateral; complete as specified Linear Feet 0.00 64.00 64.00 $115.00 $7,360.00 1-4050 1.25" curb stop and box; complete as specified Each 0.00 1.00 1.00 $1,115.00 $1,115.00 1-4138 16" x 8" water tee; complete as specified Each 0.00 1.00 1.00 $2,465.00 $2,465.00 1-4402 8" water gate valve; complete as specified Each 0.00 1.00 1.00 $3,165.00 $3,165.00 1-4414 16" water valve cut-ins; complete as specified Each 0.00 5.00 5.00 $17,425.00 $87,125.00 1-4712 2' lateral casing; complete as specified Linear Feet 0.00 11.00 11.00 $36.00 $396.00 1-30000 8" manhole chemical liner for existing manhole 15-3044; complete as specified Lump Sum 0.00 1.00 1.00 $8,858.43 $8,858.43 1-30001 Cut curb ramps; complete as specified Lump Sum 0.00 1.00 1.00 $840.00 $840.00 1-30002 16" watermain offset at lift station; complete as specified Lump Sum 0.00 1.00 1.00 $14,437.38 $14,437.38 1-30003 Grout 21" joint manhole 15- 498 to N-9; complete as specified Lump Sum 0.00 1.00 1.00 $1,778.00 $1,778.00 1-30004 Dig down and re-backfill 16" valve; complete as specified Lump Sum 0.00 1.00 1.00 $3,510.65 $3,510.65 1-30005 Backfill hole for valve City decided not to install; complete as specified Lump Sum 0.00 1.00 1.00 $3,921.00 $3,921.00 ADDITIONAL WORK REQUIRED: ALTERNATE 2 (BID ITEMS 3050-2 - 3113H-2) SUBTOTAL: NET DECREASE: Page 11 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA CONTRACT 22-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-30006 Install water service at 1803 Bowen Street; complete as specified Lump Sum 0.00 0.00 $6,504.96 $285,994.43 $0.00 $285,994.43 $91,458.75 ($16,492.00) $285,994.43 $360,961.18NET INCREASE TO CONTRACT: ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS) SUBTOTAL: NET INCREASE: NET INCREASE TO SECTION I: NET INCREASE TO ADDITIONAL WORK : NET DECREASE TO ALTERNATE 2: Page 12 of 12 Docusign Envelope ID: 76902EF4-961B-4B74-9BA1-6D2D9FC04CDA