Loading...
HomeMy WebLinkAbout0110739-Plumbing (repair sewer/lateral)OSHKOSH ON THE WATER .lob Address 1551 DELAWARE ST Contractor OSHKOSH AREA SCHOOL DIST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner OSH AREA SCHL DIST SOUTH PARK Category 430 - Industrial-Exterior (laterals) No 110739 Create Date 09/23/2004 Plan Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Whirlpool 0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 LocalWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Toilet 0 Lndry Stndp 0 ClothesWshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0 Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature REPAIR SANITARY SEWER LATERAL, CORNER OF FLORIDA AND DELAWARE AT SOUTH PARK MIDDLE SCHOOL of Work Size Material Type Sanitary Sewer 10" Vitrified Clay Lateral Storm Sewer Water Service Conn. Type 1 Repair 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $2,000.00 Plan Approval $0.00 Permit Fees $50.00 ~J Permit Voided Issued By Parcel Id # 1301920000 Date 09~24/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX3048 OSHKOSH WI 54903 - 0000 Telephone Number 424-0135 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.