HomeMy WebLinkAbout0110665-Plumbing (abandon 3 sewers)OSHKOSH
ON THE WATER
,Job Address 1000 1100 PIONEER DR
Contractor J.F. AHERN CO
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
Owner DECADES MONTHLY INCOME & APPREC FUN Create Date
Category 431 - Industrial-Exterior (other) Plan
110665
09/21/2004
Bathtub 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Lavatory 0 Lndry Tray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Toilet 0 Lndry Stndp 0 ClothesWshr 0 Ice Chest 0 FIrNVst Sink 0 Int Grease Trap 0
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Bar Sink 0 Dishwasher 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 EyeWash Statn 0
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
ABANDON 3 SEWERS
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
Lateral
# Conn. Type
0
0
3 Aband
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $1,500.00 Plan Approval $0.00 Permit Fees $150.00 ~ Permit Voided
Issued By
Parcel Id #
0302100000
Date 09/22/2004
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 1316 FOND DU LAC WI 54936 - 1316 Telephone Number
920-907-5560
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.